build.bvmcontracting.com

Tag: preconstruction process residential construction

  • Our Preconstruction Process and Referral Program

    Our Preconstruction Process and Referral Program

    Article Summary

    TLDR: BVM Contracting addresses Toronto’s residential construction trust problem through a comprehensive paid pre-construction process ($1,500-$4,000+HST) that filters for qualified clients through 15-30 detailed questions, provides bottom-up preliminary estimates, and sets realistic expectations before any commitment.

    This thorough approach—which includes constructability reviews and budget protection—transforms satisfied clients into natural advocates, fueling a community-focused referral program that keeps marketing dollars local instead of funding Meta and Google ads.

    Key insight: Contractors who ask about your 5-10 year vision and explain competitor relationships honestly are more trustworthy than those offering quick free estimates.

    We’ve Changed our process to align with our ideal clients

    The problem isn’t what homeowners tell us in our first meetings.

    It’s what they don’t tell us. More accurately, it’s what they don’t know about.

    When we sit down with someone whose already talked to three or more other contractors, the gaps become obvious. We ask questions they’ve never heard before. We explain things nobody else mentioned. Their surprise tells us everything we need to know about the industry’s transparency problem.

    Maybe those contractors don’t want to scare away their only lead this week. Maybe the reasons are worse. Either way, homeowners aren’t getting the whole truth and that is why the renovation and home building industry has such a bad reputation.

    The data backs this up. 78% of homeowners went over budget on their last renovation project. That doesn’t happen when expectations are properly set from day one.

    The Questions Nobody Else Asks

    Our first meetings sound different than what homeowners expect.

    Where do you see yourself in 5-10 years? What do you value most in a home builder? Have you done substantial renovation projects before? How many other companies are you talking to? Have you been given a bottom-up budget for your project?

    What do you care about most: cost, quality, or speed? What mechanisms are currently in place to protect your construction budget?

    These aren’t small talk. They’re qualifying questions that help us understand if we’re the right fit for each other.

    Most contractors are desperate for any client. We learned the hard way that’s backwards thinking.

    One bad client can take the space of 2-3 good clients. The time, energy, and stress they create isn’t worth it. Better to understand that before anyone gets too involved.

    How We Build Trust Through Transparency

    After those qualifying questions, we offer bottom-up preliminary estimating. With or without design drawings.

    We ensure constructability, budget adherence, and project feasibility before asking for formal commitments. It’s a good-faith gesture that puts our best foot forward.

    It’s also quite a bit of work.

    We see it as the most pivotal part of our process because it filters out the wrong clients. Some appreciate our thoroughness. Others are just shopping for the lowest number.

    The filter works through engagement. We ask 10-30 questions depending on project complexity, size, and available information. Clients who answer thoughtfully and engage with the process signal they’ll be good fits. Those who don’t engage don’t get pricing.

    We’re gatekeeping our own estimates.

    The scope of work creation and bottom-up estimate become by-products of this engagement filter. The real value is identifying clients who understand what we’re providing: realistic, truthful estimates built on actual data.

    Understanding Costs Versus Questioning Costs

    When we debrief about preliminary estimates, client questions reveal everything.

    Some ask: “Can you walk me through the HVAC scope and pricing? I didn’t realize that was a consideration and want to make sure I understand what this includes.”

    Others ask: “The HVAC costs seem high, what is that about?”

    The first question seeks understanding. The second challenges price. That distinction tells us who becomes a BVM Contracting client. We get it, price is a factor, but what about honesty? We tend to value the latter because one way or another you are going to pay the same amount, so it is up to you to determine how early on in the process you want the truth.

    Understanding-focused questions mean clients are pre-selling themselves. They recognize the difference between our detailed estimates and contractors throwing numbers at walls.

    Why We Started Charging For Pre-Construction

    We used to give away comprehensive pre-construction services completely free.

    Then we learned something critical: free attracted the wrong people. Clients who didn’t see value in having a builder actively scrutinize their plans weren’t right for us. We needed a mechanism to deter people from taking advantage of our expertise.

    We’ve been taken advantage of many times over the years. We know the overwhelming value we provide to the right homeowners.

    So we shifted to adding a pre-construction agreement with fees ranging anywhere from $1,500-$4,000 + HST, depending on the complexity of the project and at what point we are engaged. The savings from bringing in the right team during planning will save multiples of that cost during the project, we’ve seen it many times with our current and past clients.

    The charging itself has become a filtering criterion.

    The best part? The signing of the pre-construction agreement doesn’t require a commitment to work with us after pre-construction. It’s a test-drive for both parties to ensure there is a good fit. The fees paid go toward the project if clients decide to move forward, but at the end of the day it is an investment in getting the right team together to ensure a buildable design.

    Research shows that 95% of renovation cost overruns happen because of poorly defined project scopes. Our pre-construction process directly addresses that root cause.

    From Satisfied Clients To Natural Advocates

    Client advocacy doesn’t happen overnight.

    We work with some clients for over two years when you factor in pre-construction, design, permitting, and actual construction. That’s a long time to build and maintain rapport. It also means the margin of error is slim.

    One unmet expectation can sour a relationship. As builders, we have hundreds of expectations to maintain throughout that timeline.

    The clients who reach the end wanting to refer others share a common experience: sound pre-construction that set proper expectations during planning. Everything that follows becomes manageable because the foundation was solid.

    That’s why we formalized our referral program.

    How Our Referral Program Works

    We recently launched a referral program for past clients, subcontractors, and network partners who know our work.

    If anyone in our network doesn’t want their friends or family going through a poorly planned project, they refer them to us.

    The program has two options. First, both the referring party and referred party get paid when the referred party signs on for pre-construction with BVM. Second, the full payment goes to the referred party to incentivize entering a no-commitment pre-construction agreement with us.

    Why offer an option where referrers give up their payment?

    Through feedback, we identified two camps. Some people don’t want to make money by referring us. They just want to help friends and family avoid horrible renovation and home-building experiences.

    We didn’t create this program out of necessity. People already refer us without incentives. The program supercharges our network to send people they think we can help.

    It also keeps money in the communities we work in instead of giving it to Meta and Google for ads. Given that people are four times more likely to make a purchase when referred by a friend, this approach makes strategic and community sense.

    Best Practices For Choosing The Right Contractor

    If you’re considering a renovation or home building project, here’s how to identify trustworthy contractors before signing anything.

    First, pay attention to what they say about their competitors.

    If they talk negatively about other contractors, ask yourself: what will they say behind your back? That answer reveals the type of person and company you’re dealing with.

    Second, ask them directly how they ensure trust is maintained throughout the entire working relationship with their clients.

    Their answer will either be vague or specific. Vague answers signal they haven’t thought it through. Specific answers with systems and processes signal they’ve built trust maintenance into their operations.

    Third, notice what questions they ask you in initial meetings.

    Are they trying to understand your long-term vision, values, and project goals? Or are they focused on closing the deal quickly and making you commit prematurely? The questions contractors ask reveal their priorities.

    Finally, be wary of estimates that come too quickly.

    Accurate estimates require detailed planning that can’t be done in a few hours. Contractors providing fast, free estimates are using unreliable methods. They’re either underestimating to win your business or padding numbers to cover uncertainty.

    Neither approach serves you well.

    The construction industry has a trust problem because too many contractors hide information instead of revealing it. We built our entire pre-construction process around the opposite approach: asking questions nobody else asks, explaining things nobody else mentions, and being transparent about realistic costs before anyone commits.

    Above all we know the value sound planning makes to residential construction projects, so instead of asking for committments, we provide value through a thorough pre-construction agreement and process that earns your trust along the way.

    That transparency turns satisfied clients into natural advocates. And those advocates help us keep marketing dollars in our community while protecting their friends and family from poorly planned projects.

    It’s a system that works because it’s built on truth from the first conversation.

    About BVM COntracting

    BVM Contracting is a full-service General Contractor or Home Builder located in Toronto. We provide home renovation and building services for major home renovations and custom home builds (full interior renovations, home additions, lot severances, new home construction, garden suites, and laneway suites). Our goal is to help guide our clients through the process of building their home, from concept to completion.

    Further than providing General Contracting and Project Management for major home renovations, we also offer value-added services such as renovation financing, renovation rebate consultations and services, building permit and design services, smart home installation services, and real estate investor services.

    To learn more about our offering by visiting our services page. Learn more about our vision, mission, and values here.

  • Your Guide to Obtaining Building Permits in Toronto

    Your Guide to Obtaining Building Permits in Toronto

    Your Guide to Obtaining Building Permits In Toronto

    If you are looking into ways to improve your property, add additional space, create a completely new home, or add an ancillary dwelling (i.e. garden suite) in Toronto then you will need to obtain a building permit. In this article we break down the step-by-step process that you should take on your journey of getting a building permit for your residential construction project, and what the key considerations should be along the way.

    Note that this guide is meant to cover the process of getting a building permit for home additions, new home construction projects, ancillary dwellings (like garden suites and laneway suites), and other ancillary structures (like garages and decks). If you are looking to renovate your existing home you may be able to expedite the process through The City of Toronto’s Fast Track program. Please reach out to us to learn more by visiting our contact page.

    Steps to receiving a building permit in toronto

    STEP 1: Review your properties Zoning to determine what is possible

    The City of Toronto has no shortage of information online about what zoning bylaws apply to your property. The most important resource you should know about is the Toronto Interactive Zoning Bylaw Map, which you can use to find what zoning your property has and what specific rules the property is constrained by. If this is too much work for you, any reputable General Contractor or permit designer/architect should be able to let you know what is, isn’t, and might-be possible on your property (we go over the might-be scenario below).

    If you determine your property is (or might be) able to complete the work you want to complete, then you can proceed to step 2. If you aren’t sure then you can always reach out to us to get a zoning review completed!

    Step 2: Designer Selection and Preliminary Cost Estimates

    Once you have a general idea of what is possible to complete on your property, now is the time to get fee proposals from permit designers and/or architects to give you pricing for completing the necessary drawings that will need to be reviewed by the City of Toronto to get your building permit. We put together a detailed guide on what to consider when choosing a permit designer or architect for your residential construction permit so you can be armed with the right information before making a decision.

    At this step you will also want to reach out to a General Contractor with experience working on similar residential construction projects to yours that will be able to evaluate your proposed project and attach a preliminary cost estimate for the project, so you can make sure you can afford the work before committing to your designer or architect of choice. With BVM Contracting this service comes at no charge and is a standard operating procedure for anyone looking to work with us.

    Pro Tip: Make sure that you push your permit designer or architect to calculate the fees for how much your permit is going to cost, so that you can budget accordingly.

    Step 3: Preliminary Plans and Zoning Review

    Once you have determined that you can afford your proposed renovation or home building project and have committed to a permit designer or architect, it is time to go to work on developing the plans for your proposed work.

    Depending on your chosen project this process may differ slightly, but the goal is always the same – to submit a completed application for your project for the City of Toronto Building Department to review for compliance with your local zoning by-laws and exceptions. Note that you will need to pay fees for the zoning review (25 %), but they count towards the total cost that is payable for the entire permit, so there is no additional cost to completing one.

    We cannot stress how important it is to get your preliminary set of drawings in for review with the City for zoning review as soon as you can, because it will dictate what your next step is (see below) and it takes time for them to get you the feedback you need. You can expect this step to take anywhere from 2-4 months depending on how well you work with your designer, how responsive they are to your requested changes to the plans, if you need an updated survey for the property to support the application, and how fast the City can get you feedback for your proposed plans.

    Step 4a: Receipt of zoning Certificate and permit submission drawings

    If your zoning application for your proposed project complies with all local zoning by-laws, then you will get a zoning certificate to confirm that your application can be submitted for a building permit.

    When you receive your certificate, your permit designer or architect will then start working on adding in the necessary building code information that applies to your proposed project so that the plans can be ready to be reviewed again by the City for their building code review.

    Additional to the work completed by the permit designer or architect, your project will likely also need to be reviewed by a structural engineer to do the engineering design work needed for the proposed project, and if you are created a new home, ancillary structure, or home addition you will need to get an HVAC permit, which will involve an HVAC designer or engineer to complete the necessary heat loss calculations and HVAC design for the new home build, home addition, or ancillary dwelling. Note that the HVAC permit is separate from the building permit and you do not necessarily need to submit the HVAC permit at the same time as the building permit (though it usually is for the sake of having all of the information before starting the project. Also note that the permit designer or architect will also need to file a plumbing permit for the proposed work, which is a separate application from the building permit and HVAC permit.

    The Ontario Building Code (OBC) overlay drawings, HVAC design/permitting, and structural design are always completed AFTER the zoning review has been approved and the certificate has been obtained. If you start doing the work before you may run the risk of having to redo the structural and HVAC designs, which will end up costing you more money.

    The process of getting together what we like to call the “permit submission drawings” can take anywhere from 1-3 months, and another month to get the permit itself once it has been submitted to the City.

    This is also the point in time where you will have to pay out the remaining permit fees for your project. The City of Toronto discloses all of their building permit fees on their website, and note that the costs that are not flat fees are all per meter squared, so do not be fooled by the low numbers. You can learn more about the current fees for residential building permits in Toronto below!

    Step 4B: Minor variances and Committee of Adjustment in Toronto

    If your zoning application has been flagged for minor variances to the local zoning bylaws of your neighbourhood, you will have two options:

    • Make the necessary changes to get your project to comply

    • Submit an application to Committee of Adjustment to get approval for the minor variances

    Note that your permit designer or architect should be able to help determine if there are any large risks in going through with Committee of Adjustment, or if you will have a high likelihood of obtaining an approval. There is always a risk of getting rejected, but if there are any doubts about your application you can always consult a private planning consultant to help with your application, which we can help refer you to.

    You will need to expect the following if you end up going to Committee of Adjustment:

    • Additional costs for submitting the application and being represented by your permit designer, architect, or planning consultant (which is recommended for 99% of applications)

    • Additional time spent waiting for a Committee of Adjustment hearing (which can take anywhere from 2-6 months)

    • Community involvement – your neighbours will be able to file letters of support or letters of opposition toward your project and potentially have their say during the hearing about why it may not be a good idea. You will want to make sure you have the support of your neighbours with the more complex applications, that is for sure!

    Once you get your Committee of Adjustment Hearing scheduled, go through the proceedings, and obtain an approval you can go back to step 4A to complete your permit application! If you have been rejected then proceed to step 5.

    Also note that the Committee of Adjustment may give you partial approval with conditions set out to make changes/concessions to your plans to conform with certain minor variances. This will give you a chance to proceed to the permit submission phase but will mean that some changes will need to be made to your plans to fit within certain variances. If C of A gives you this option you should try to take it, because going to step 5 will be another costly venture and will take even more time.

    Step 5: Appealing a Committee of Adjustment Decision with The Toronto Local Appeal Body (TLAB)

    If your application at Committee of Adjustment is rejected that is not the end of the road entirely, you will have the option to appeal the decision by filing an application to The Toronto Local Appeal Body (otherwise known as TLAB). This will give you an additional chance to present your case in more of a court-like setting and retain even better representation (such as a lawyer or planning consultant) so you can increase your chances of winning an approval.

    It needs to be noted that you will end up spending even more money and time in getting the application set-up for TLAB, and it is always recommended to discuss your application with a lawyer and/or a planning consultant prior to filing to make sure your chances of success are high. Below we have attached a video from The City of Toronto that explains TLAB in a bit more detail and have attached the link to the TLAB page located on The City of Toronto’s website.

    Step 6: Time to Build!

    Once you have made it past step 4A it is time to wait for the permits to come through and get ready to schedule your project! Concurrently with all of the work getting permits obtained you should be working with a General Contractor to put together a representative budget and scope of work for your project. Ideally this process starts right after you obtain your zoning certificate, but can be completed anytime after that point as well. In order to get the most accurate budgets for our clients (and to procure everything before a contract is signed) we try to have the HVAC and Structural drawings on hand as well but they are not needed to start the process of building a scope and budget for your renovation or home building process.

    If you at any point in the building permit process and are in need of transparent advice and realistic costs then please reach out to us so we can help out! We help out potential clients at every point in the pre-construction process to make sure you are confident every step of the way!

    Residential Building Permit Fees in Toronto (Group C)

    When planning a new build or renovation project in Toronto, understanding the building permit fees is crucial. For homeowners and developers, this is an essential step in the overall process to ensure compliance with city regulations. The City of Toronto unfortunately does not make the process of calculating your total permit costs easy (as you will be able to see by visiting the link below), but we have extracted the key information that will give you a good idea of estimated costs.

    The City of Toronto categorizes residential projects under Group C, which covers single-family homes, duplexes, triplexes, and fourplexes. Here’s a breakdown of the relevant rates as on January 1st, 2024.

    Main Building Permit Fees in toronto

    • New Construction or Additions: The base fee is $17.16 per square meter. This applies to projects involving Single Family Dwellings, Semis, Townhouses, Duplexes, Live/Work Units, and multi-unit dwellings.

    • Demolition Fee: The base fee for demolition is $0.16 per square meter

    • Residential Unit Fee: Each new residential unit included in an application is $52.08/unit

    • Interior Alterations/Renovations: If you’re remodeling or upgrading your home without adding new space, the fee is $5.73 per square meter.

    • Single Family Detached Garages, Accessory Structures: $198.59 each

    Residential HVAC and plumbing Permit Fees in toronto

    • Heating and Ventilating only, with no ductwork: $198.59 flat fee

    • Heating, Ventilating and Air Conditioning: $250.22 flat fee

    • Boiler/Furnace Replacement: $198.59 flat fee

    • A/C Unit Addition: $198.59 flat fee

    • Other Group C – Buildings: $1.29/m2

    HVAC Alterations

    • Add on System, (Unit Heater, Make-up Air Unit, Exhaust Fan) and/or Ductwork Alterations: $198.59 flat fee

    • Boiler/Furnace Replacement or A/C unit: $357.45 flat fee

    Plumbing and Drainage Systems – Fixtures/Equipment/Roof Drains:

    • Single Family Dwelling: $21.45 each

    • All other Buildings: $28.61 each

    Piping for Single Family Detached or Attached Dwellings:

    • Water services, Sanitary and Storm Buried Piping: $198.59 flat fee

    • Repairs, Replacement and Additions of Buried Plumbing and Drainage Piping, Pool Drains: $198.59 flat fee

    Piping for all other buildings

    • Inside Sanitary and Storm Piping $2.42/linear metre

    • Outside Water Services, Sanitary and Storm Piping $2.42/linear metre

    Other Plumbing Work

    • Backwater Valves, Manholes, Catchbasins, Interceptors and Sumps Complete with Pumps: $35.75 each

    • Backflow Prevention Devices (devices requiring testing): $85.79 each

    Zoning Applicable Law Certificate Fees in toronto

    As per the City of Toronto Permit Fees Webpage, “Zoning Applicable Law Certificate application provides a review of a proposal to determine its compliance with the City’s Zoning By-law and other Applicable Laws”. Our guide to understanding zoning reviews can give you more information about this topic, and most times it is recommended to get a zoning review for your major renovation or home building project in Toronto.

    • Accessory residential buildings and structures, e.g. garages, porches, balconies: $198.59 flat fee

    • New House and additions, conversions, and alterations to houses: $595.77 flat fee

    • All other proposals (i.e. driveway widening, landscaping, pool fence enclosure, etc.): $198.59 flat fee

    Note that the zoning review certificate (what you receive after the City Examiner has approved your plans for zoning) costs 25% of the total permit cost, which is payable prior to receiving the certificate. Also note that this certificate also has an expiry after a year of issuance so be mindful of that when you are going to submit your final building permit application.

    What else do i need to know about building permit fees in toronto?

    The rates above reflect the current City of Toronto fees and are critical to factor into your project’s budget. Keep in mind that additional fees may apply depending on the project’s complexity, zoning requirements, and any necessary approvals and is subject to review by the City of Toronto Building Department.

    This information ensures you’re prepared for every step in the building permit process. For expert guidance and help navigating these requirements, BVM Contracting is here to streamline your project from start to finish.

    About BVM COntracting

    BVM Contracting is a full-service General Contractor or Home Builder located in Toronto. We provide home renovation and building services for major home renovations (kitchen renovations, bathroom renovations, basement renovations, full interior renovations, home additions, lot severances, and new home construction). Our goal is to help guide our clients through the process of renovating their home, from concept to completion.

    Further than providing General Contracting and Project Management for major home renovations, we also offer value-added services such as renovation financing, renovation rebate consultations and services, building permit and design services, smart home installation services, and real estate investor services.

    To learn more about our offering by visiting our services page.

  • Why Contacting a General Contractor First Is Important

    Why Contacting a General Contractor First Is Important

    Talking to a General Contractor First Will Save You Time and Money

    Many times a year we get home owners, real estate investors, and property owners reach out to us with proposed designs for their home renovation or home building projects in Toronto. Sometimes they even have the permit drawings in hand and are reaching out to a General Contractor for the first time. This is the exact opposite way you should be going through the process of completing residential construction.

    Why should I reach out to a general Contractor First?

    The reason is simple, why would you go through the design process without consulting the people who will inevitably be in charge of handling the outcome and costs of the work? A business owner wouldn’t make changes to their bookkeeping or business structure without consulting their accountant, and the same theory should apply with General Contractors.

    Why don’t more people reach out to general Contractors first in their pre-construction process?

    We think the reason why people do not consult General Contractors first is a three-fold problem:

    1. General Contractors are historically not easy people to get information from if you are not committed to them in some way

    2. It takes additional up-front effort to reach out to General Contractors before knowing if you are committed to moving forward into the design process

    3. Designers and Architects are not incentivized to get clients to check with General Contractors about what the estimated costs might be for their proposed project, because it means that they may lose business because the client cannot afford the work.

    How reaching out to BVM Contracting First Will save you time and money

    BVM Contracting is changing the way people look at the pre-construction process in residential construction and make it very easy to reach out to us to better evaluate your project.

    Since we have a dedicated sales and estimating team we make it very easy to get right the information you need in order to make the best decision about committing to a renovation or home building project. We do all of this work without asking for anything in return, we see our help and insight as a trust-building exercise that will allow people to naturally gravitate towards using our services once they can afford to complete their proposed work.

    Not only will you get transparent advice and honest project costing feedback, but some of the other benefits of reaching out to us first is:

    • We can evaluate your existing property to make sure that your proposed project is making the best use of your property/home. Sometimes people think they need a home addition when what they really need is a basement renovation, and we can listen to your needs and ask the right questions to make sure you are spending your money wisely.

    • We have a trusted network of planning consultants, designers, architects, vendors, engineers, and HVAC designers that we can refer you to and make sure you are surrounded by people that are in the business for the right reasons and will offer transparent and honest advice.

    • We can give you some upfront insight into what the potential roadblocks will be for your project, give you information into the process of obtaining a building permit, and what to expect during the pre-construction process for your particular project.

    What is the biggest benefit of approaching a General Contractor first?

    The largest benefit by far (and what people reach out to us the most about) is to understand what the costs will be for a certain type of project they want to complete. We allow people to stay in control during the pre-construction process by giving them the costs as early on in the process as possible so they know what they are getting into before committing to the design and permitting work for the project.

    With the help of existing floor plans, home inspection reports, a discovery phone call, some detailed questions about the existing property, and a bunch of data gathered from pricing out all kinds of renovation and home building projects in Toronto we can very accurately estimate the construction costs for your project. This allows for you to make the ultimate decision of moving forward with the project design, or holding off until you can afford to complete the work. In either scenario it is a win for us because we are building trust and a network of potential projects for years to come.

    Being an honest General Contractor is a slow burn but it is worth it when you get the same people coming back to you once they can afford to renovate or build and want to get your advice about what their next best step is.

    About BVM COntracting

    BVM Contracting is a full-service General Contractor or Home Builder located in Toronto. We provide home renovation and building services for major home renovations (kitchen renovations, bathroom renovations, basement renovations, full interior renovations, home additions, lot severances, and new home construction). Our goal is to help guide our clients through the process of renovating their home, from concept to completion.

    Further than providing General Contracting and Project Management for major home renovations, we also offer value-added services such as renovation financing, renovation rebate consultations and services, building permit and design services, smart home installation services, and real estate investor services.

    To learn more about our offering by visiting our services page.