  • What Does It Cost to Build a Custom Home in Toronto in 2026?

    What Does It Cost to Build a Custom Home in Toronto in 2026?

    TLDR: Most online cost calculators show best-case construction numbers that ignore soft costs, finishes, utility upgrades, and HST. The realistic all-in range for a custom home in Toronto in 2026 is $1,200,000 to $2,000,000+. We can be more specific than a range: our current Cliffside custom build, about 5,100 sq ft including a legal basement apartment, carries a verified budget of $1,844,862.40, inclusive of construction, finishes, and HST. This article breaks down where numbers like that come from.

    Forget the Per-Square-Foot Number You Saw Online

    Homeowners regularly come to us holding per-square-foot estimates from architects and other builders. It is always fun to explain why those numbers are not representative of their project. Two 3,000 sq ft homes in Toronto can cost wildly different amounts depending on the kitchen, the flooring, the exterior cladding, and a hundred decisions in between. A single number per square foot flattens all of that into something that sounds precise and tells you almost nothing.

    To figure out a real budget, we take the time to price the actual scope of work. Since we usually start working with clients before drawings exist, we can set those expectations early, and the projects that start with real numbers end up being the best executed and most efficient ones we build.

    A Real, Verified Number: Our Cliffside Custom Build

    Talk is cheap, so here is an exact figure. Our current custom build on Cliffcrest Drive, in the Cliffside neighbourhood of the Scarborough Bluffs, carries a budget of $1,844,862.40. That covers the entire construction and finishing scope, inclusive of HST, for roughly 5,100 sq ft: about 3,800 sq ft above grade plus a 1,300 sq ft basement with a legal apartment. The full story of that project, including the two-plus years of pre-construction behind it, is in our Cliffcrest Drive case study.

    Divide it out and you get roughly $360 per square foot, all-in. Now here is why we still will not lead with that number: apply it to a 2,400 sq ft home on a different lot with different soil, different utility connections, and different finishes, and it would mislead you badly. The exact number matters because of everything underneath it, not because you can multiply it against your floor area.

    For contrast, our Port Union build on Rouge Highlands Drive came in around $1.5M for roughly 4,000 sq ft three years ago. Materials and site costs have climbed since. The direction of travel matters as much as any snapshot.

    What a Real Custom Home Budget Looks Like in 2026

    The most common all-in range we see across Toronto, from Scarborough to North York to East York: $1,200,000 to $2,000,000+. That spectrum runs from a modest 2,000 sq ft home to a 4,000+ sq ft home with a finished legal basement suite. Three decisions move the number most: total size, finish level, and the complexity of the design and exterior.

    The Costs Nobody Warns You About

    Beyond finishes and size, three line items surprise almost every first-time custom home client:

    Utility upgrades. Most people do not realize what it costs to upgrade all of the utilities when you build new. Between gas, electricity, and water, you will be spending over $40,000 by the time it is all said and done. That money buys you capacity your new home genuinely needs, and it buys you nothing you can see.

    Shoring. No one likes to talk about shoring until it is too late to redesign the home on the property, which is usually never an option. Depending on your lot and your neighbours’ foundations, shoring can run into the tens of thousands of dollars. It shows up on tight urban lots far more often than homeowners expect.

    HST. It is unavoidable, and it still surprises people when they see 13% attached to a build over a million dollars. Ontario’s enhanced HST rebate is worth up to $130,000, and it is worth understanding why it probably will not reach you. Eligibility stops at $1,850,000 of finished property value with the land included, and the custom homes we build in Toronto finish between $2 million and $5 million. What nearly all of our clients do collect is the older Ontario new housing rebate, worth up to $16,080. Budget the full tax either way and treat anything recovered afterwards as upside. The full breakdown, including the March 31 2027 start-of-construction deadline, is in our HST rebate guide.

    Soft Costs: The Full List, Not the Comfortable One

    We make a special effort not to sugarcoat the true soft costs of a custom home. The same discipline we apply to construction scoping applies here: give the real costs so expectations are set. Beyond design and engineering fees, plan for permit costs, tree permits, Committee of Adjustment applications where variances are needed, surveys, development charges, and the damage deposits the City of Toronto collects when you build a custom home. Depending on complexity, soft costs add 5-15% to the construction budget, and almost no online estimate includes them.

    What Most Homeowners Get Wrong

    The single biggest mistake is going through the entire design process without getting costing feedback early on. A homeowner who arrives at a finished set of drawings without real pricing attached to them is holding a beautiful document and an unknown liability. Some of those designs price out hundreds of thousands of dollars beyond the budget, and the redesign costs time, money, and momentum.

    The second mistake is the $700K budget for a 3,000 sq ft custom home. We say this with respect: it does not work in Toronto in 2026, and any builder who lets you believe otherwise is planning to have a harder conversation with you later. We would rather have the honest conversation on day one.

    Where You Can Actually Save Money

    The smartest place to save is total square footage. There is an unwritten “keeping up with the Joneses” habit where people build to the same size as their neighbours for reasons like resale value. This is nonsense. If you are building a custom home, you are building for your family first. Forget about everything except your family’s needs, and most times families discover they need less square footage than they assumed. Size is the biggest lever in the entire budget.

    The other levers: select finishes early so you know true costs while you can still pivot cheaply. Interior design costs a little more in the planning phase and pays for itself by aligning expectations before orders are placed. And ask any builder you interview about value engineering. If they have not heard the term, find a builder that has it integrated into their process, because identifying scope items that can be adjusted to save money is a continuous discipline, not a one-time exercise.

    Where Pricing Is Heading

    Steel and lumber pricing is slowly increasing through 2026, and commodity items like drywall are climbing with the turbulence in North American trade. For families planning 2027 and 2028 builds, that trajectory makes one thing more important than ever: understand your true costs very early in the process. That is exactly why our pre-construction is structured the way it is. Our Design & Feasibility Sprint is live for home additions today, and a custom home building version is on the way; until it launches, custom home families can apply through the home addition Sprint page and we will take it from there.

    The BVM Approach: What a Verified Budget Actually Is

    When we produce a budget in pre-construction, it includes actual quotes from subcontractors, vendors, and service providers, real finish budgets, utility upgrade costs, and ideally zero allowances or placeholder values. Allowances are where other quotes hide their surprises.

    It is genuinely difficult to convince every client to select all of their finishes before the project starts. The ones who do get the best executed projects we deliver. That is not a coincidence; it is the entire model.

    Key Takeaways

    • Per-square-foot estimates are not representative of your project; real budgets price your actual scope

    • Realistic all-in range for Toronto custom homes in 2026: $1.2M to $2M+

    • Verified example: ~5,100 sq ft in Cliffside, $1,844,862.40 all-in including HST

    • Utility upgrades alone exceed $40,000 on most new builds; shoring and HST are the other two surprises

    • Ontario’s enhanced HST rebate stops at $1,850,000 of finished value including the land, so most Toronto custom homes fall back to the older rebate of up to $16,080

    • The biggest savings lever is building the size your family needs, not the size your neighbours built

    • Getting real costing before finishing design is the difference between a smooth build and a redesign

    Frequently Asked Questions

    Q: What is a realistic total budget to build a custom home in Toronto in 2026?
    A: For most 2,000 to 4,000+ sq ft homes across the GTA, $1,200,000 to $2,000,000 or more, all-in. Our current ~5,100 sq ft Cliffside build carries a verified budget of $1,844,862.40 including construction, finishes, and HST.

    Q: What makes a “verified budget” different from an estimate?
    A: An estimate leans on allowances and assumptions. A verified budget is built from actual subcontractor and vendor quotes, real finish selections, and utility upgrade costs, with as close to zero placeholder values as the client’s decisions allow.

    Q: When should I get real construction pricing?
    A: Before your design is finished, and ideally before drawings start. Going through the design process without early costing feedback is a huge mistake, and it is the most common one we see.

    Ready to Talk Real Numbers?

    You are never going to find a resale home that meets absolutely every need your family has. Custom building exists for exactly that reason, and it rewards the families who start with real numbers. If you want the true cost of your build before you commit to anything, book a consultation and we will walk you through it the same way we did on Cliffcrest Drive.

    Related Reading:

  • Move or Build in Toronto? Sometimes the Honest Answer Is Move

    Move or Build in Toronto? Sometimes the Honest Answer Is Move

    TLDR: Most contractors will take your money whether a project makes sense for your family or not. BVM Contracting operates differently. Sometimes the right call is to sell your home and move, and we’ll tell you that before you sign anything. Here’s what that conversation looks like, and why it’s made us better builders over the long run.

    When “Don’t Build” Is the Most Valuable Advice We Can Give

    Picture a couple who’s spent weeks searching “custom home builders Toronto.” They’ve got ideas, a budget in mind, and they’re ready to go. But something’s off. One of them keeps saying “well, if we’re still here in five years…” and the other keeps pulling up real estate listings mid-conversation.

    That’s not a build-ready family. That’s one foot out the door.

    We’ve had that meeting dozens of times across Toronto. Leaside, Birchcliff, the Annex, East York. Every time, the conversation goes the same way: we ask a few direct questions, run the honest numbers, and the right answer emerges. Sometimes it’s a renovation. Sometimes it’s a custom build. And sometimes it’s a recommendation to go browse what’s on the market before committing to anything.

    No contract. No pitch. Just guidance.

    The Specific Signals That Moving Probably Makes More Sense

    Not every family we meet is a candidate for this conversation. But after speaking with hundreds of families a year, we’ve learned to read the signals early.

    One foot is already out the door. When a family isn’t genuinely committed to their home, neighbourhood, or city, there’s usually a reason. Once one foot is out the door, it’s almost always easier to step two feet out than to pull it back. We don’t gloss over that. We ask about it directly.

    Young kids still give geographic flexibility. Families with children under 3 or 4 years old have options that families with school-aged kids don’t. It’s straightforward: nobody wants to pull a kid out of a French immersion program on Bloor Street mid-year. A family with a two-year-old can make a neighbourhood change with far less disruption.

    The timeline doesn’t support a build. Toronto’s permit process takes time. We’ve seen clients come to us needing a solution within six months (a baby on the way, in-laws moving in, an urgent space problem). With permitting alone often running that long in Toronto, a renovation or addition can’t solve a six-month problem. Buying an existing home can.

    The math doesn’t close. This is where we get specific. We give families the real construction cost for the project they want at their current property. Not a range or ballpark — an actual scoped number. From there, they can compare it to what the same money gets them on the open market, minus Toronto’s real estate transaction costs. (We’ve written a detailed breakdown of those costs on the blog.) We’d rather they reach the right decision with accurate information than be pushed into something that isn’t right for them.

    Past clients Jaclyn and Pete went through exactly this debate before their Inwood Avenue project. They were genuinely uncertain. We walked them through both scenarios with real numbers and let them decide. They chose to build, partly because they wanted something truly unique to their family. That’s the kind of buy-in that makes a project go well from start to finish.

    How That Conversation Actually Goes

    Here’s something counterintuitive: the families most genuinely torn between moving and building usually aren’t the ones coming in excited. They’re the ones who haven’t done much research yet, whose guard is up, who aren’t sure who to trust.

    So we rarely open with “you should probably move.” We open with information. We answer every question honestly, give them the full cost picture, and let the numbers tell the story. Most families reach the right conclusion for themselves when they have all the facts in front of them.

    The ones who ARE truly excited about building? They’ve already done the homework. They’ve figured out they can add 1,200 square feet to their current home and stay in the neighbourhood they love. That excitement is grounded in something real, and it makes for a more collaborative project all the way through.

    What Most Families Get Wrong About This Decision

    The biggest mistake is treating move-vs-build as a pure financial spreadsheet exercise.

    Families put the construction estimate in one column, the new home price in another, and assume that settles it. It doesn’t. Numbers matter, but they’re one part of the picture.

    Take a family with a home in Roncesvalles that would cost considerably more to expand than a comparable finished home would cost to buy elsewhere. On paper, moving wins. But they’ve lived on that street for twelve years, their kids know every family by name, and their parents are a ten-minute walk away. None of that shows up in a spreadsheet.

    Other families have no particular attachment to their current street. When that’s genuinely the case, moving can be the better call — even when the financial gap isn’t dramatic.

    There’s no formula here. The right answer always comes down to a combination of real construction costs, the family’s actual timeline and budget, and what they truly value about where they live. Our job is to help them see all three clearly, not to tell them what the answer should be.

    The BVM Approach: Real Numbers, No Hard Sell

    We speak with hundreds of families per year across Toronto and the GTA. After enough conversations, we get good at recognizing which bucket a project falls into: build-ready, build-later, or move-first. We’re not always right (no one is). But when the information points toward a particular path, we say so plainly.

    When the data says wait, we tell clients to wait. Sometimes that means saving more money first. Sometimes it means spending the next 12 to 18 months doing the planning work that will make the actual build smoother and more successful. We give them a clear roadmap for that preparation. It’s not just “call us later.” There’s a purpose to the waiting period, and we map it out.

    What we won’t do is push a family into a project that doesn’t fit. That road leads to stressed clients, difficult builds, and the kind of outcome regret that doesn’t fade once the renovation is done.

    What Actually Happens When We Tell Clients Not to Build

    You might assume that honesty like this costs us clients. The opposite has been true.

    We’ve had countless families we first spoke with five years ago come back when their situation changed. The early conversation stayed with them. Not because we were impressive, but because we were straight with them when most contractors wouldn’t be.

    We’ve had a young couple we told to move (not build) turn around and refer their parents to us for a full addition project. The parents would never have called us if their kids hadn’t told them: “we talked to a contractor who was actually honest with us.”

    “When you engage with BVM you become part of our family, and family is honest even if we have to have tough conversations.” That’s not marketing language. It’s how the business actually works. We treat every conversation, whether it leads to a contract or not, as if we were giving advice to someone we care about. Long-term builders in Toronto can’t afford to operate any other way. Short-term thinking produces short-term reputations.

    The kind of reputation we’ve built here takes decades. We’ve spent exactly that long building it.

    Key Takeaways

    • A family with one foot out the door is a candidate for a move-first conversation, not a renovation pitch

    • Toronto’s permit process (often six months or more) makes buying an existing home the only viable option when timing is genuinely tight

    • Real scoped construction costs — not estimates or ranges — are the foundation of any honest move-vs-build decision

    • Clients told to wait almost always come back when the time is right, and they refer others in the meantime

    • There’s no universal threshold. The right answer always depends on budget, timeline, attachment to the property, and what the family actually needs

    Frequently Asked Questions

    Q: Does BVM charge for an initial consultation to help us work through the move-vs-build decision?

    A: Our early conversations are just that: conversations. We don’t charge for an honest read on whether building makes sense for your situation. If we can help you avoid a bad decision upfront, that matters more to us than any consulting fee.

    Q: What if we’ve already started the planning process and you think we should move instead?

    A: That’s a harder conversation to have, but we’ll still have it if the data is pointing somewhere important. Better to course-correct early than to be halfway through a build wishing you’d moved.

    Q: How do you actually calculate whether building or buying makes more financial sense in Toronto?

    A: We give you a real scoped cost for the specific project you want. Not per-square-foot, but an actual construction number. You compare that to your purchasing power on the open market, minus Toronto’s transaction costs. We’ve written a detailed breakdown of those costs on the blog worth reading before you make any decision either way.

    Ready to Have a Straight Conversation?

    If you’re weighing whether to stay and build or sell and move, the most useful thing you can do is talk to people who’ve seen both play out hundreds of times. We’ll give you real numbers, share what the data suggests, and let you make the call.

    Book a time with our team at bvmcontracting.com. No pitch. Just an honest conversation.

    Related Reading:

  • Custom Home Building Mistakes That Cost Toronto Homeowners the Most

    Custom Home Building Mistakes That Cost Toronto Homeowners the Most

    TLDR: Most custom home disasters are locked in before construction starts. The wrong pre-construction team, vague drawings, and designs priced without real specifications create a gap between expectation and reality that no amount of good site work can close. Here’s what separates the builds people brag about from the ones that become cautionary tales.

    The Gap Between Dream Home and Disaster Starts Before Ground Breaks

    You’ve found the lot. The architect has rough sketches. You’re already mentally arranging furniture.

    And you haven’t had a serious cost conversation yet.

    This is where most Toronto custom home projects go wrong — not during framing, not when a trade walks off mid-project, not when material prices spike. The expensive custom home building mistakes get locked in during planning. By the time a shovel hits the ground, the outcome is largely determined.

    We’ve watched this play out on projects across North York, Etobicoke, and the rest of the GTA. Families who did everything right during construction still had painful experiences because the planning foundation was wrong. And families who came in with vague plans and a “we’ll figure it out as we go” attitude? They paid for it. Literally.

    The hard truth: most of what makes a custom home project go badly was preventable. It just required having the right people involved at the right time.

    The Most Expensive Mistake Isn’t What You Think

    When homeowners imagine what could go wrong on a custom build, they picture structural surprises. Water in the foundation. A trade walking off mid-project. Materials delayed six weeks.

    The real killer is simpler — and more preventable.

    Not assembling the right pre-construction team.

    That means assuming an architect is enough. Trusting that a builder’s white-labelled design team — the one generating vague permit-ready plans with finishing details left “up for interpretation” — is actually protecting your interests. Treating interior design as something you’ll sort out later, once framing is done.

    “Not having a seasoned pre-construction team ready to work in your best interests right at the beginning of the process is what separates the amazingly executed custom homes from the horror story custom home building experiences that create a massive gap between expectation and reality.”

    That gap — between what you imagined and what you got — almost always traces back to this moment.

    Why Budget Blowouts Happen (It’s Not the Economy)

    Every time lumber or steel prices tick up, homeowners blame cost overruns on the market. That’s a convenient story. It’s also mostly wrong.

    Here’s what actually causes custom home building budget blowouts in Toronto:

    95% of the time, it’s one of these three things:

    • Lack of proper planning

    • Lack of detailed specifications and design

    • Lack of expectation-setting between builder and client about what’s actually in scope

    Not supply chains. Not subcontractors. Not bad luck.

    A detailed budget requires detailed plans. Detailed plans require detailed specifications. And all of it requires a builder willing to have hard conversations before you commit — not after the money is already spent.

    When a builder gives you a ballpark number without knowing your tile selections, ceiling heights, fixture grade, or exterior cladding — that number is fiction. When reality arrives on site, you’re the one who absorbs the difference.

    We’ve had clients come to us after signing with another builder, confused about why their “final” number keeps moving. Nine times out of ten, the answer is in the original contract: budget allowances everywhere, specifications vague or missing, scope described in generalities. A contract like that isn’t a budget — it’s a starting point for negotiation you’ll lose.

    What Actually Happens During Pre-Construction (When It’s Done Right)

    The industry standard is for a builder to price what’s in the drawings. Full stop.

    Our standard is different.

    Before a project goes to permit, our in-house estimation and scoping team scrutinizes the drawings — not just to price them, but to question them. To ask whether the client actually wants what’s shown. To flag when moving a wall three feet can save $10,000 in steel. To catch the kitchen layout that’ll require a structural beam nobody budgeted for.

    We don’t just hand back a number. We walk clients through what the drawings show, where the costs are concentrated, and what alternatives exist.

    “Since we deal with families doing this work for the first (and usually only) time, we make sure the experience is equal parts informative and educational as it is accurate and comprehensive so they understand why we are asking certain questions and where their money can be spent the most effectively.”

    Most families build one custom home in their lives. They don’t know what they don’t know. That’s not a criticism — it’s just the reality. Our job isn’t to hand them a number and move on. It’s to make sure they understand every decision before it becomes a line item on a change order.

    What Most Homeowners Get Wrong: The Design Trap

    There’s a well-funded industry built around getting homeowners to fall in love with a design before they know what it costs.

    Some companies hire salespeople whose only job is to get you to sign a design agreement. Once you’re emotionally committed to a floor plan — the open kitchen, the primary suite layout, the double-height entry — your leverage disappears. By the time a builder prices it out and the real number lands, pulling back is painful. You’ve already spent $25,000 on drawings. You’ve been living in this house in your head for six months.

    Don’t get baited too far into the design before consulting a custom home builder.

    A Scarborough family we worked with came to us after spending $28,000 on architectural drawings for a home they couldn’t build within their budget. Another set of clients had committed to a custom design in Leaside that required $175,000 more in structural work than anyone had told them. In both cases, no one was lying to them outright. They just weren’t being protected.

    Our approach is to lead with the truth — even when it means telling someone their budget won’t support the home they’ve designed. Even when it means losing the project. We’re a family-owned company. We’ve done our own renovation projects. We know what it actually feels like to be displaced from your home during construction, to manage that stress, to wish someone had told you something sooner.

    That reputation for honesty is worth more to us than any single contract.

    Red Flags Before a Shovel Hits the Ground

    The warning signs of a bad builder usually show up before construction starts. You just have to know what you’re looking for.

    No structured pre-construction process. Moving from proposal to permit without a defined scoping, budgeting, and specification phase is a red flag. Full stop.

    Reactive, not proactive. You’re chasing them for answers instead of the other way around. Questions go unanswered. Updates only come when you ask.

    Rushed to close. They’re pushing you to sign and get started without making sure everything is properly planned. Anyone urgently trying to get you under contract before questions are answered is not working in your interest.

    You don’t know your own project. This is the one that matters most. How much do you actually know about what’s in your scope? About what your drawings show? About what’s included in the price versus what’s an allowance?

    “The less you know the more that is up for interpretation, which means the likelihood of a poor project experience is way higher.”

    Ambiguity is the enemy. A great pre-construction process eliminates it. A weak one exploits it.

    What Homeowners Wish They’d Done Differently

    After projects wrap, there’s a pattern in what clients tell us.

    They wish they’d taken more time on finishes, selections, and interior design details before construction started.

    Not during construction. Before.

    “The more detailed the drawings, specifications, and finishing details are before the project starts, the less stress you will have during construction and the likelihood of having unnecessary change orders goes down exponentially.”

    We can’t get change orders to zero — life happens, clients change their minds, site conditions surprise everyone sometimes. But with sound design and planning, we get as close to zero as the project allows. The difference between a project with five change orders and one with fifty almost always comes down to how complete the plan was on day one.

    An interior designer isn’t a luxury on a custom build. On a project this size, it’s risk management.

    90 Days Out: Three Things to Double-Check Right Now

    If you’re 90 days from breaking ground on your Toronto custom home, here’s where to focus:

    1. Make sure your entire scope is procured. Every budget allowance is a risk you’re carrying. “Allowance for tile: $15/sq ft” means your builder doesn’t know what tile you want — and when you pick $45/sq ft tile, that gap is yours. Go line by line. Close every allowance you can.

    2. Get an interior designer involved if you don’t have finishes locked in. It’s not too late. Getting someone involved now — even for a focused sprint on selections and specifications — can prevent costly decisions being made on-site under pressure.

    3. Make sure your plans match your scope of work. Even minor things — tile locations, exterior finishes, hardware grades — should align between your drawings and your scope. Any discrepancy is a problem waiting to surface during construction. The bottom line: you should have a fully procured and finalized budget with a detailed set of drawings and specifications in hand that actually match each other.

    Key Takeaways

    • The most expensive custom home building mistakes in Toronto happen during planning, not construction

    • 95% of budget blowouts trace back to poor planning, vague specs, or unclear scope — not material costs

    • Don’t commit to a design before a builder has costed it with real specificity

    • A good pre-construction process is proactive, detailed, and puts you in control of every decision before it becomes expensive

    • Budget allowances are risks you’re carrying — close them before construction starts

    • Finishes, selections, and interior design should be resolved before ground breaks, not figured out on site

    Frequently Asked Questions

    Q: How do I know if my custom home budget is realistic before committing to a design?

    A: Get a builder involved before you finalize the design. A rough cost-per-square-foot number isn’t enough — you need a builder who’ll review the actual scope, ask about your finishes and specifications, and give you a number grounded in real subcontractor pricing. If a builder won’t have that conversation early, that tells you everything.

    Q: What should a proper pre-construction process include?

    A: At minimum: a detailed scope of work, a complete set of drawings that match the scope, pricing tied to real specifications rather than allowances, and a clear definition of what’s included and what isn’t. If your contract is full of allowances and general descriptions, you don’t have a budget — you have a placeholder.

    Q: When is it too late to hire an interior designer for a custom home project?

    A: 90 days before breaking ground is not too late. Ideally you’d have a designer involved during the design phase to coordinate finishes with the architecture from the start. But if you’re approaching construction without finalized selections, getting someone involved now is still worth it. Decisions made on-site under construction pressure are the most expensive kind.

    Q: What’s the difference between a custom home builder and a general contractor?

    A: A true custom home builder brings pre-construction expertise — cost planning, design coordination, specification development — that a general contractor typically doesn’t offer. The distinction matters most during planning: a custom home builder should be catching problems before they’re built, not just managing trades after the drawings are approved.

    Ready to Talk About Your Build?

    If you’re in the early stages of planning a custom home in Toronto or the GTA, the single most valuable conversation you can have is an honest one with a builder before you’ve committed to anything. Not a pitch — a real conversation about what your project will actually take, what it’ll cost, and what questions you should be asking before you sign.

    Book a call with our team directly at bvmcontracting.com. We’ll tell you what we see, whether or not it leads to a project together.

    Related Reading:

  • A Custom New Build That Three Years Later, Still Opens Its Doors

    A Custom New Build That Three Years Later, Still Opens Its Doors

    Julianne and Junior LeBlanc came to BVM Contracting with a vision: tear down what was there and build the custom home they’d always wanted. We delivered a ~4,000 sq ft, $1.5M custom build in Port Union — the easternmost community in Scarborough along the Lake Ontario shoreline — on time, on budget — during one of the most turbulent material supply periods in recent memory. Three years later, when we needed a real-world example to show a new family what a BVM home looks like, Julianne and Junior didn’t hesitate. They opened their front door.

    That’s the kind of relationship we build — not just homes.

    Home Build Project Information

    Project Type: Full tear-down and custom new build
    Location: Port Union, Scarborough, Toronto
    Scope: ~4,000 sq ft custom home (main floor, second floor, basement with gym, three-car garage, covered rear porch)
    Duration of Construction: 9 months
    Timeline of our services: Pre-construction through to completed construction
    Client: Young family, Port Union
    Architect: Chris Ziannis — CZ Designs
    Project Cost Breakdown: Inquire here

    Building During the Worst Supply Chain Year in Memory

    When Julianne and Junior signed on with BVM Contracting in 2021, they weren’t just buying a construction contract — they were trusting us with their most significant financial investment. And they were doing it at the worst possible time for materials.

    2021 was a year that tested every builder in Canada. Lumber prices had spiked to historic highs. Lead times for windows stretched to 14–16 weeks. Roof trusses were backlogged for months. Structural steel pricing was volatile enough that we had to lock in quotes on specific dates just to hold numbers.

    A less experienced builder would have handed over a budget and hoped for the best. We took a different approach.

    From day one, our team sat with Julianne and Junior and built a line-by-line budget — every trade, every material, every phase of the project documented with full transparency. When lumber came in higher than expected, we didn’t hide it. We worked through the budget together, found over $14,600 in savings on framing alone, and protected their overall number without cutting corners on quality.

    The final framing cost came in at $193,400 against an original $208,000 estimate.

    Bottom line: Full budget transparency — even when the numbers shift — builds the kind of trust that survives a supply chain crisis.

    A Home Designed to Turn Heads — and Last Decades

    The LeBlanc residence isn’t a typical new build. Every exterior and interior decision was made with intention.

    Exterior

    The curb appeal of this home is immediate and unmistakable. The exterior combines three distinct cladding systems that work together as a cohesive whole:

    Standing seam charcoal metal roof — across both the main floor and second floor, including a flat roof section. Metal roofing was chosen for its longevity, weather performance, and the clean architectural statement it makes.

    James Hardie fibre cement siding — a combination of vertical and horizontal runs in a rich iron gray, providing a maintenance-free envelope that holds its colour and resists the freeze-thaw cycles that punish Ontario exteriors every winter.

    Permacon Laffit thin stone veneer — in a Chambord Grey blend that grounds the home and adds natural texture against the Hardie panels.

    Natural stone accents — 3-inch sill stones, natural stone gable vents, and natural cut stone for the eave transitions bring a custom masonry feel without the full masonry cost.

    The windows and doors are Golden Windows wood-aluminum clad units with internal grilles and simulated divided lights (SDLs), all finished in black — a bold choice that frames every opening and ties the exterior together. A 52×96 insulated steel front door with a 12-inch sidelite anchors the entry with presence.

    A 48×48 Velux fixed skylight in the front foyer brings natural light deep into the main floor — one of those details you notice the moment you walk through the front door.

    Garage

    The three-car garage isn’t an afterthought — it was designed with the same attention the rest of the home received. With its own framed footprint, insulated doors, and mudroom-to-garage access point, it functions as a true extension of the home.

    Covered Rear Porch & Outdoor Living

    The rear of the home features a covered porch with a gas fireplace — an outdoor living space that genuinely extends the usable season for the family. The sliding door system connects indoor to outdoor seamlessly, making it one of the most used features of the home year-round.

    Basement

    The basement was designed as a functional living level, not storage. With 9-foot ceilings throughout and a dedicated gym and golf area built to 10-foot ceiling clearance, it’s a level of the home the LeBlanc family actually uses.

    How We Kept a 9-Month Custom Build on Schedule

    Managing a $1.5M custom build in a supply-chain crisis isn’t just about construction knowledge — it’s about anticipation.

    Order early, order smart. We placed the Golden Windows order the moment the specifications were locked — knowing 14–16 week lead times meant any delay would cost months on the back end. They arrived on schedule. We planned for trusses knowing delivery wouldn’t come until October — and built the schedule to absorb it without idling the crew.

    Daily communication, not weekly updates. Our project managers were in regular contact with Julianne and Junior throughout the build — not just at formal site meetings, but daily when decisions needed to be made. Custom homes require hundreds of small decisions along the way. Our clients should never feel like they’re waiting on us.

    Transparent draw schedule. Every draw was documented against the budget. Julianne and Junior always knew exactly what had been spent, what was remaining, and what was coming next. There were no surprises at the end.

    Holding the budget without sacrificing the build. When framing material costs came in higher than the original estimate — as they did for every builder in 2021 — we didn’t absorb the cost quietly or pad elsewhere. We brought the numbers to the table, found $14,600 in legitimate savings on the lumber package, and issued a formal credit. The final framing cost came in at $193,400 against an original $208,000 estimate.

    The result: a move-in ready home delivered in 9 months with no significant time delays and no cost overruns.

    Bottom line: Proactive ordering and daily communication aren’t extras — they’re the reason custom home builds finish on time.

    What the LeBlanc Family Said

    “BVM was a pleasure to work with for our new build project. Their project managers helped with all the planning ahead of the build, and created a detailed budget for all phases of the project that was both transparent and accurate. Once building was underway, we had regular site meetings and daily conversations to ensure everything was completed to our satisfaction and in a timely manner. Our home was move-in ready in 9 months with no significant time or cost delays! We would use BVM again and highly recommend them for both small and large construction projects.”

    Julianne & Junior LeBlanc, homeowners, 396 Rouge Highlands Drive

    The Moment That Said Everything

    Three years after completion, BVM Contracting was working with a new family planning a custom home in the Cliffside area of the Scarborough Bluffs — a similar vision, similar scope. They wanted to see what a BVM home actually looks and feels like.

    We reached out to Julianne and Junior.

    Without hesitation, they said yes. They opened their home — their personal space, their private investment — to a family they had never met, simply because they believed in what BVM Contracting had built for them.

    There was no obligation. No incentive. Just the confidence of a family who got exactly what they were promised, and were proud to show it off.

    That moment is the clearest measure of success we know: a client who becomes an ambassador.

    Key Takeaways

    Transparency builds trust — A line-by-line budget, documented at every draw, means no surprises and no erosion of confidence

    Supply chain requires strategy, not luck — Ordering windows 14 weeks ahead of need, planning truss delivery into the schedule, and monitoring steel pricing daily kept the project moving when others stalled

    Communication is a deliverable — Daily contact with clients isn’t extra effort, it’s part of what we build

    A great build has a long life — The LeBlanc home didn’t stop being a BVM success story when the permit closed. Three years later, it’s still doing work for us — and for them

    Thinking About Building Your Custom Home?

    The LeBlanc residence is proof that a custom home at this level — done right, with full transparency and no surprises — is achievable. Even when the world around you is making it harder.

    BVM Contracting has the experience, the process, and the relationships to deliver your custom home on time and on budget.

    Let’s start the conversation.

    647-401-HOME (4663)
    www.bvmcontracting.com

    Related Reading

  • Scarborough Bluffs Home Addition Evaluation Guide

    Scarborough Bluffs Home Addition Evaluation Guide

    TL;DR: Across 47 home addition projects in Birch Cliff, Cliffside, Cliffcrest, and Guildwood, the biggest project killer isn’t design or foundation problems. Property owners unknowingly face TRCA jurisdiction, protected ravine setbacks, and Urban Forestry requirements that add 2-4 months to timelines. Early zoning review separates 4-month permits from 12-month + regulatory processes. Budget expectations from 5-10 years ago no longer match current construction costs. Pre-construction planning ($1,500-$4,000 + HST) prevents mid-build discoveries that cost $35,000-$65,000 + HST to fix.

    What You Need to Know:

    • Most Scarborough Bluffs properties sit in TRCA-regulated areas without owners knowing

    • TRCA involvement adds 2-3 months minimum to planning timelines

    • Foundation evaluation saves $35,000+ by catching issues before construction starts

    • Permit timelines range from 4-12 months depending on Committee of Adjustment, TRCA, and Urban Forestry requirements

    • One project shifted from $350,000 rear extension to $600,000 second-storey addition after TRCA flagged ravine proximity

    What Catches Scarborough Bluffs Homeowners Off Guard?

    Properties in Birch Cliff, Cliffside, Cliffcrest, and Guildwood have larger lot sizes than most Toronto neighbourhoods. You get flexibility for home additions that properties in The Beaches or tighter areas don’t have.

    That flexibility comes with a potential regulatory cost.

    Many Scarborough Bluffs properties sit in TRCA-regulated areas. The Toronto and Region Conservation Authority (TRCA) governs any property near ravines or within watershed protection zones. Homeowners discover this mid-process, after investing in preliminary designs.

    We start every project with a zoning review. This includes checking TRCA jurisdiction and identifying on-site or off-site trees that will affect permitting. The review takes 10 minutes and determines whether you’re looking at a 4-month permit timeline or an 18-month regulatory process.

    How Does TRCA Involvement Affect Your Timeline?

    If your property requires TRCA approval, add 2-3 months minimum to your planning stage. This affects timeline more than budget (though application fees apply).

    Realistic permit timelines for Scarborough Bluffs home additions: 4-12 months.

    The major timeline variables:

    • Committee of Adjustment requirement: adds 2-4 months

    • TRCA involvement: adds 2-3 months

    • Urban Forestry coordination: adds 1-2 months

    • Architectural design team speed: varies by firm

    Example from Cliffside: A homeowner came to us after preliminary designs were complete. The architectural partner had designed a rear extension without accounting for the ravine at the back of the property.

    TRCA flagged the proximity to the stable top of bank. The rear extension became unbuildable. The project pivoted to a full second-storey addition.

    Budget jumped from $350,000 to $600,000 because the clients needed more space than originally discussed. They went with the cheapest quote they received. The project took 12 months with multiple cost overruns. Our timeline estimate was 6 months with no overruns.

    Bottom Line: TRCA review doesn’t happen quickly. Get their involvement early in the process to reduce risk to your project timeline.

    What Is the Stable Top of Bank and Why Does It Matter?

    TRCA uses the stable top of bank as one metric to evaluate construction projects in their jurisdiction. You need to know this measurement before you design anything near a ravine.

    You need two things to determine stable top of bank location:

    1. TRCA involvement early to evaluate preliminary design

    2. Updated topographical survey showing grading on the property

    The survey reveals where the stable top of bank sits and how steep the ravine slopes.

    Cost to find out if you’re in TRCA jurisdiction:

    • Topographical survey: $2,800-$3,000

    • TRCA application fee: $1,420 (Major projects) or $2,705 (Complex projects)

    What Counts as a Major vs. Complex Project?

    Major projects: Additions, new structures, works in floodplain or erosion hazard, fill placement over 30 cubic metres. Includes technical analysis in up to two disciplines (Environmental Impact Study review, stormwater management screening, standard geotechnical review). Up to one site visit and two meetings. Maximum two submissions included.

    Complex projects: Major additions exceeding 50% of original ground floor area, new structures, works requiring multiple technical studies. These projects need detailed ecological, geotechnical, water resource engineering, hydro-geological, or fluvial geomorphology studies. Up to three technical team meetings and two site visits. Maximum three submissions included.

    We’ve built rapport with the TRCA evaluation team. We connect with them for preliminary feedback before formal application. This helps homeowners understand what to expect before spending application fees.

    Key Point: You’re spending $4,220-$5,705 to discover if your addition design works before you invest in full architectural drawings. This prevents the $250,000 budget jump we saw in that Cliffside project.

    Foundation Considerations for Properties in The Scarborough Bluffs

    When a property is being evaluated for a home addition in any of the neighbourhoods in the Scarborough Bluffs we always start off with a blank slate review of the property in question’s foundation and soil conditions.

    Two factors that always need to be considered when determining if a home can be built onto with a home addition:

    1. Soil conditions (sandy to silty, minimal clay)

    2. Existing foundation and footings condition

    We evaluate soil conditions with our structural engineer and identify whether existing foundations and footings get reused. Most of the time they do. We reduce unknowns as early as possible to avoid cost overruns during construction. 

    Even with expansive experience across 47 projects (and counting) in these neighbourhoods, we confirm conditions with an engineering review on every project.

    How One Foundation Review Saved $35,000

    One Cliffside project saved $35,000 through early foundation evaluation. We identified that footings sat 16 inches below the existing basement slab.

    This eliminated the need for underpinning entirely.

    If we’d discovered during construction that footings were only 8 inches deep instead of 16, the ability to pivot would have been limited. The project might have required resubmitting plans for revised permits if we shifted from underpinning to floor lowering. That means additional fees and time waiting for revised permits.

    We inform clients through proactive planning, not reactive decision-making during construction.

    Key Point: Foundation evaluation shouldn’t create anxiety. The goal is clarity for homeowners. BVM provides these reviews as part of pre-construction planning.

    What Do Homeowners Get Wrong About Budgeting for a Home Addition?

    Two items consistently need correction in first consultations:

    1. Budget expectations

    2. Zoning constraints

    Homeowners relying on project budgets from 5-10 years ago create immediate misalignment. If someone completed a home addition in the past or knows what friends or family spent years ago, we inform them about current construction costs.

    Kitchen quality alone affects budget by tens of thousands of dollars. Bathroom costs stay the same regardless of home size. These fixed costs don’t scale the way homeowners expect.

    We also work with homeowners who inherited unpermitted work from previous owners or don’t understand their property’s zoning constraints. This requires getting a residential design team involved in initial analysis so we have another perspective and get a proposal for design, planning, and permitting work required to get a permit.

    Key Point: Budget conversations happen before design work begins. Once you understand current construction costs and your property’s zoning reality, you make informed decisions about project scope.

    Why Does Architectural Partner Selection Matter More in Scarborough Bluffs?

    The Scarborough Bluffs properties face zoning complexity, Committee of Adjustment patterns, and TRCA coordination that other Toronto neighbourhoods don’t encounter at the same frequency.

    Some architectural partners bypass proper zoning review. We’ve seen this cause problems way too many times.

    The architectural teams we work with (including The Constructible Design Co.) have experience navigating TRCA requirements. They budget the time needed to get through TRCA approval. They understand that properties near the bluffs or ravines leading to the bluffs may need TRCA involvement.

    We verify architectural work before permits go in. Toronto permit examinations are a lot more involved and involved many different stakeholders and internal reviews that only the most experienced architectural partners can navigate effectively.

    Key Point: Architectural partners with TRCA experience prevent the mid-process design pivots that blow up budgets and timelines.

    How Does Pre-Construction Planning Change Project Outcomes for Home Additions?

    When we compare two similar Scarborough Bluffs projects (one with thorough pre-construction planning versus one that shortcut the process), the time difference from first consultation to move-in day spans months.

    The clients who work with us buy into the pre-construction planning we provide. We rarely deal with reactive planning. The difference between a planned jobsite and one that isn’t thoroughly planned shows up in multiple ways:

    • Stressed clients

    • Delays

    • Additional costs

    • Rework

    • Poorly managed projects

    What’s Included in BVM’s Pre-Construction Process?

    Step 1: Zoning review
    TRCA jurisdiction check, tree identification, regulatory body coordination

    Step 2: Foundation and soil evaluation
    Engineering review of existing conditions

    Step 3: Architectural partner coordination
    Design accounts for all constraints

    Step 4: Timeline mapping
    Accounts for all regulatory variables

    Step 5: Detailed cost database access
    47 projects worth of Scarborough Bluffs-specific data

    This work costs $1,500-$4,000 + HST. You save multiples of that amount by preventing mid-construction discoveries.

    Key Point: Pre-construction planning reduces unknowns before you commit to design and construction contracts. This is where project scopes get massaged to reduce the risk of budget blowouts.

    What Do 47 Projects Reveal About Scarborough Bluffs Additions?

    After 47 projects (and counting) across Birch Cliff, Cliffside, Cliffcrest, and Guildwood, the pattern is clear.

    Homeowners who understand their property’s regulatory reality before design work begins end up with projects that stay on timeline and budget. Those who discover TRCA jurisdiction, Committee of Adjustment requirements, or foundation issues mid-process face cascading delays.

    Scarborough Bluffs neighbourhoods offer space and flexibility that make home additions attractive. That same geography creates regulatory layering that requires early identification.

    We’ve built the project database. We know which properties trigger which requirements. We can tell you within 20 minutes whether your addition faces a standard timeline or needs TRCA coordination.

    Clarity before you commit to design work separates projects that proceed smoothly from those that stall for months.

    Key Point: The project database we’ve built from 47 (and counting) Scarborough Bluffs additions gives you predictive costing and timeline accuracy that contractors quoting from instinct don’t have.

    Frequently Asked Questions About Scarborough Bluffs Home Additions

    How do I know if my property is in a TRCA-regulated area?

    We check TRCA jurisdiction during initial zoning review. If your property is near a ravine or within watershed protection zones in Birch Cliff, Cliffside, Cliffcrest, or Guildwood, you likely need TRCA approval. This takes 10 minutes to confirm.

    What’s the difference between a 4-month permit and an 12-month permit?

    Standard permits with no Committee of Adjustment, TRCA, or Urban Forestry involvement run between 4-6 months. Add Committee of Adjustment (2-4 months), TRCA (1-2 months), and Urban Forestry (1-2 months) together and you reach 8-14 months before construction starts.

    When should I get a foundation evaluation?

    Before architectural design is finalized. Foundation evaluation during pre-construction lets you pivot if needed. Discovery during construction limits your options and adds delays. BVM Contracting offers foundation and soil evaluations within our pre-construction scope.

    How accurate are construction cost estimates from 5 years ago?

    They’re no longer reliable. Construction costs have shifted. Kitchen quality alone affects budget by tens of thousands of dollars. Bathroom costs stay fixed regardless of home size. We update homeowners on current pricing during first consultation. We have built a home addition cost calculator to give Scarborough and Toronto Homeowners more transparency about their home addition projects in the City

    Do all Scarborough Bluffs properties need topographical surveys?

    Only properties in TRCA jurisdiction need them. An updated topographic survey ($2,800-$3,000) shows grading and helps determine stable top of bank location. This prevents the design pivots that blow up budgets.

    What happens if I inherit unpermitted work from a previous owner?

    We identify unpermitted work during zoning review and coordinate with a residential design team to address it. This may or may not affect permit approval and we can help you identify any potential issues but also solutions.

    Why does architectural partner experience with TRCA matter?

    Architectural partners unfamiliar with TRCA requirements design without accounting for ravine setbacks or stable top of bank calculations. This causes mid-process design pivots that add months and tens of thousands of dollars to budgets.

    How much does pre-construction planning cost and what does it prevent?

    Pre-construction planning costs $1,500-$4,000 + HST. You prevent mid-construction discoveries that cost $35,000-$65,000 + HST to fix. You also avoid the timeline delays that cascade when problems surface during construction.

    Next Steps for Your Scarborough Bluffs Property

    If you’re considering a home addition in Birch Cliff, Cliffside, Cliffcrest, or Guildwood, start with a zoning review. This includes TRCA jurisdiction check and tree identification.

    The zoning review determines your realistic timeline and identifies regulatory requirements before you invest in architectural design.

    We offer no-obligation consultations. We review your property’s zoning constraints and provide timeline estimates based on our project database. You leave with clarity on what your property supports and what regulatory path you’re facing.

    Contact BVM Contracting to schedule your property review. We’ll tell you what 47 previous projects in your neighbourhood have taught us about turning your addition vision into buildable reality.

    Key Takeaways for Scarborough Bluffs Home Additions

    • Most Scarborough Bluffs properties sit in TRCA-regulated areas without owners knowing. Early zoning review (10 minutes) identifies this before you invest in design.

    • TRCA involvement, Committee of Adjustment, and Urban Forestry coordination add 5-9 months to permit timelines. Budget backwards from your target start date.

    • Foundation evaluation during pre-construction saves $35,000-$65,000 + HST by catching issues before construction starts.

    • Budget expectations from 5-10 years ago no longer match current construction costs. Kitchen quality alone swings budgets by tens of thousands of dollars.

    • Architectural partners with TRCA experience prevent mid-process design pivots. One Cliffside project jumped from $350,000 to $600,000 after ravine proximity forced a design change.

    • Pre-construction planning ($1,500-$4,000 + HST) reduces unknowns before you commit to design and construction contracts. This is where projects get won or lost.

    • The BVM project database (47 Scarborough Bluffs additions) provides predictive costing and timeline accuracy that contractors quoting from instinct don’t have.

    More Informative Home Addition Content

    About BVM COntracting

    BVM Contracting is a full-service General Contractor or Home Builder located in Toronto. We provide home renovation and building services for major home renovations and custom home builds (full interior renovations, home additions, lot severances, new home construction, garden suites, and laneway suites). Our goal is to help guide our clients through the process of building their home, from concept to completion.

    Further than providing General Contracting and Project Management for major home renovations, we also offer value-added services such as renovation financing, renovation rebate consultations and services, building permit and design services, smart home installation services, and real estate investor services.

    To learn more about our offering by visiting our services page. Learn more about our vision, mission, and values here.

  • Custom Home Builders Versus General Contractors

    Custom Home Builders Versus General Contractors

    the difference between Custom Home Builders and General Contractors? The Answer will surprise you…

    Many Toronto homeowners regularly pay a premium for identical construction work. The difference? One company calls itself a “custom home builder,” while the other markets itself as what it truly is, a “general contractor.”

    We’ve spent 25+ years in Toronto’s residential construction industry. The reality is that there is a surprising indifference between custom home builders and reliable general contractors, and we are here to explain why!

    The Marketing Angle Behind Custom Building

    Every custom home builder is actually a general contractor. The distinction exists purely for marketing purposes.

    When companies add “custom homes” to their business name, they’re targeting a wealthier demographic willing to pay premium prices. The underlying business structure remains identical to any specialized residential general contractor.

    We build custom homes at BVM Contracting. We also complete custom renovations, additions, and multi-unit developments. But we don’t hide what we actually are: a general contractor.

    Ontario’s regulatory framework proves this point. HCRA licensing requirements are identical for both “custom builders” and general contractors performing new home construction. Both need the exact same vendor and builder licenses.

    The Subcontracting Reality Nobody Talks About

    Custom home builders subcontract 90% or more of their projects. General contractors do the exact same thing.

    Complex custom builds require specialized skills from electrical, plumbing, HVAC, and finishing subcontractors. No single company performs all this work in-house, regardless of their marketing label.

    The business model is identical. Both coordinate the same network of specialized subcontractors. Both charge similar coordination fees. Both follow the same process from design through close-out.

    We maintain a reliable network of subcontractors who stand behind their work and prioritize our projects. Every other “custom builder” in Toronto operates the same way.

    The Premium Pricing Strategy

    Toronto’s construction pricing reveals the markup strategy clearly. Basic custom home builds cost $400 to $500 per square foot while high-end custom builds reach $450 to $750 per square foot.

    Sometimes homeowners are just paying more for the same thing, period.

    Many general contractors possess the same systems, processes, and reliability that custom home builders offer. The “custom” label simply allows access to clients who will pay premium prices for identical services.

    The whole process for design, pre-construction, home building, and close-out remains the same. Custom home builders usually just package it into a neater bow to justify higher pricing.

    What Toronto Homeowners Should Actually Evaluate

    Focus on the fit of the people behind the name rather than getting caught up in marketing labels.

    Ask about contract terms, payment schedules, and references. Request to see current projects. Verify they offer a warranty they’ll actually stand behind.

    Evaluate their pre-construction process. Quality contractors provide thorough planning regardless of their business title. At BVM Contracting, we offer comprehensive pre-construction services at no charge to demonstrate our commitment to project success and to build trust.

    Look at their actual track record. Review completed projects, speak with past clients, and assess their communication style during initial consultations.

    The Truth About Construction Expertise

    Expertise and specialization matter more than industry titles in Toronto’s residential construction market.

    We aim to be the beacon of hope in an industry riddled with misinformation and poor guidance. Our family-owned approach allows us to properly care for each client because we value the reputation we’ve built over decades.

    The construction process doesn’t change based on marketing labels. Quality, reliability, and transparent communication determine project success.

    Make your decision based on substance, not marketing packaging. Your project deserves better than paying a premium for identical services wrapped in fancier branding.

    About BVM Contracting

    BVM Contracting is a full-service General Contractor or Home Builder located in Toronto. We provide home renovation and building services for major home renovations (kitchen renovations, bathroom renovations, basement renovations, full interior renovations, home additions, lot severances, new home construction, multi-unit renovations, garden suite construction, and laneway suite construction). Our goal is to help guide our clients through the process of renovating their home, from concept to completion.

    Further than providing General Contracting and Project Management for major home renovations and home building projects in Toronto, we also offer value-added services such as renovation financing, renovation rebate consultations and services, building permit and design services, smart home installation services, and real estate investor services.

    To learn more about our offering by visiting our services page.