  • The Perfect Home Build Doesn’t Exist

    The Perfect Home Build Doesn’t Exist

    Why perfection is a myth in residential construction

    Most homeowners start their construction journey with a fantasy. They imagine flawless execution, zero surprises, and seamless progress from groundbreaking to move-in day.

    This fantasy will cost them money, time, and sanity.

    Here’s what actually happens: 91% of construction projects experience delays. Only 25% finish within 10% of their original timeline.

    The numbers don’t lie. Perfect builds don’t exist.

    But here’s where most people get it wrong. They think the goal should be finding a builder who avoids problems.

    The real goal is finding a builder who solves them brilliantly.

    When Reality Hits Your Foundation

    We recently worked on a home addition project in East York. The plan was straightforward: build the rear extension on helical piles.

    One week into the project, we discovered the soil conditions couldn’t support the load. The piles wouldn’t work.

    Most contractors would panic. Some would push forward anyway and hope for the best. Others would disappear entirely.

    We did something different.

    Within 48 hours, we had a complete alternative plan. We pivoted to a traditional foundation system that could handle the weight. We presented the client with clear pricing, explained exactly why the change was necessary, and implemented the solution.

    The result? A $10,000 cost increase that the client accepted without hesitation.

    Why? Because we had built trust through transparent communication before the crisis hit.

    The Problem-Solving Advantage

    Every challenge we encounter makes us more valuable to future clients. Each problem we solve adds to our database of real-world solutions.

    When we sit down with new clients during pre-construction, we can anticipate issues that other builders miss entirely. We have those difficult conversations upfront that most contractors avoid.

    We talk about buildability concerns. We identify design choices that will unnecessarily inflate costs. We question structural plans when engineering firms overdesign solutions.

    Recently, we saved a client tens of thousands of dollars by simply questioning an overly complex steel beam specification. The engineering firm had overengineered the structural setup.

    Most builders would have built what was on the plans and collected their fee. We saw an opportunity to add value.

    Why Clients Choose Honest Builders

    When we explained to our East York client that the helical piles wouldn’t work, we didn’t sugarcoat the situation. We said exactly this:

    “The piles can’t hold the weight of your extension. We won’t move forward with something that compromises your home’s structural integrity. Here’s our alternative plan and exactly what it will cost.”

    The conversation took 20 minutes. The client approved the change immediately.

    This happens because we approach every challenge matter-of-factly and always have a solution ready.

    Poor planning causes 31.4% of construction delays. Most contractors fail to properly consider project scope, budget, timeline, and resources from the start.

    We built our entire pre-construction process around preventing these failures.

    The Trust Factor

    Trust isn’t built when everything goes perfectly. Trust is built when things go wrong and your builder handles them expertly.

    Our family-owned approach means we oversee every project. When challenges arise, clients aren’t dealing with a faceless corporation or an overwhelmed project manager.

    They’re working with someone who has solved similar problems hundreds of times before.

    The best builders aren’t the ones who promise perfection. They’re the ones who deliver excellence despite inevitable imperfections.

    Redefining Construction Excellence

    We’ve shifted how we talk about our work. Instead of promising flawless execution, we promise expert problem-solving.

    Instead of hiding our past challenges, we use them as proof of our capabilities.

    Instead of avoiding difficult conversations, we initiate them during pre-construction to build trust before it’s tested.

    This approach has created something remarkable: clients who actually get excited when challenges arise because they know we’ll turn them into opportunities.

    The construction industry is filled with horror stories because too many builders make promises they can’t keep. They paint rosy pictures that reality quickly destroys.

    We do the opposite. We prepare clients for construction realities while demonstrating our ability to handle whatever comes up.

    The result? Projects that exceed expectations not because they’re perfect, but because they’re expertly managed from start to finish.

    Perfect builds are a myth. Perfect builders don’t exist either.

    But builders who turn inevitable challenges into competitive advantages? Those are the ones worth waiting for.

    BVM Contracting is a full-service General Contractor or Home Builder located in Toronto. We provide home renovation and building services for major home renovations (kitchen renovations, bathroom renovations, basement renovations, full interior renovations, home additions, lot severances, new home construction, multi-unit renovations, garden suite construction, and laneway suite construction). Our goal is to help guide our clients through the process of renovating their home, from concept to completion.

    Further than providing General Contracting and Project Management for major home renovations and home building projects in Toronto, we also offer value-added services such as renovation financing, renovation rebate consultations and services, building permit and design services, smart home installation services, and real estate investor services.

    To learn more about our offering by visiting our services page.

  • Understanding the Stratification Process For Residential Properties in Toronto

    Understanding the Stratification Process For Residential Properties in Toronto

    Understanding the Stratification Process For Residential Properties in Toronto

    Transforming a property into multiple condominium units, also known as stratification, can be an excellent way for homeowners in Toronto to maximize their property’s value and create separate, sellable units. It is entirely possible to do this, just take a look below at a property that sold 4 separate units earlier in 2024.

    As exciting as the idea is, stratifying a residentially zoned property involves a series of intricate steps. It requires the coordination of various stakeholders, including Lawyers, Property Management Teams, Surveyors, a General Contractor, and even an architectural partner. Each of these professionals plays a critical role in ensuring the legal, financial, and structural aspects of the stratification are handled properly.

    In this comprehensive guide, we will outline the detailed process of stratifying a residential property in Toronto, covering everything from the minimum requirements and associated costs to establishing a condo corporation and understanding condo agreements. By the end, homeowners and real estate investors will have a clear understanding of the complexities and potential benefits of this transformative process.

    Stratification is the process of converting a property into multiple self-contained units, otherwise known as condominiums. Stratification is most often used for very large condo developments that we see all over Toronto, but it is entirely possible to create a smaller condo on a residential property! Stratification allows homeowners and real estate investors to create separate, legally recognized units that can be sold individually. This is a viable alternative to creating a self-contained dwelling unit for rental, but there is a more complicated process involved that we go into detail in this article.

    The process involves a review of the property’s layout, zoning regulations, and structural integrity. Critical stakeholders in this undertaking include Lawyers, who ensure compliance with legal requirements; property management teams, who handle operational aspects; Surveyors, who provide precise property measurements and boundaries; Architectural Partners, who create the necessary designs to allow for an existing or new building to house separate units; General Contractors, who are tasked with managing the construction of the proposed designs to get the new units created and code-compliant; and your local utilities and municipality, who will be needed to ensure that each of the units are serviced separately and can act as a standalone property.

    This collaborative approach ensures that each unit meets the necessary standards for living space, safety, and marketability. Stratification not only has the potential to increase property value but it also addresses the growing demand for diverse low-rise housing options in Toronto. Homeowners and real estate investors alike can potentially benefit from additional income by selling or renting out individual units, thereby optimizing the use and value of their residential property.

    Stratifying a residential property in Toronto presents several advantages for homeowners and real estate investors. Firstly, it maximizes property value by transforming a single dwelling into multiple revenue-generating units. This diversification allows owners to sell or lease individual condos, tapping into different market segments and potentially increasing cash flow and profit.

    Stratification meets the growing demand for flexible housing solutions within urban areas, addressing a City like Toronto’s housing shortages by creating more living spaces on existing plots. The added bonus is that you are creating lower-barrier ownership opportunities for more people who might be priced out of living in certain neighbourhoods.

    Additionally, stratification enables owners to benefit from property appreciation and increased marketability. The process of creating separate units can also lead to tax advantages, as each unit may be assessed individually and lower the per-unit property tax amount. Lastly, by establishing a condo corporation, owners can ensure the ongoing management and maintenance of the property, preserving its value and appeal over time. This structured approach to property division offers financial and strategic benefits, making it an appealing option for those looking to capitalize on their residential assets.

    The stratification process begins with a thorough assessment of the property’s suitability for conversion. This includes evaluating zoning regulations, structural integrity, and potential market demand. This is a step that BVM Contracting completes with all of our multi-unit clients and can walk you through the zoning constraints for your property, potential options for utilizing the existing structure (versus a new home build), and can work closely with one of our real estate agent partners to help evaluate which bedroom/bathroom configuration will give you the best return on investment. At this point we also include one of our architectural partners that can help verify zoning constraints and provide pricing for the design and permitting of the proposed work.

    Next, once it is determined that what you want to build is feasible from a zoning, structural, and financial perspective, homeowners must engage with an experience real estate lawyer to navigate legal requirements, obtain necessary approvals, and compile the correct documentation to create a legal condo/strata. Surveyors play a crucial role by defining property boundaries and preparing detailed site plans.

    Once legalities are in place, the physical conversion begins. This involves designing and constructing separate units, ensuring compliance with building codes, and possibly upgrading/separating utilities to support multiple dwellings. During this phase (but ideally even before construction begins), a property management team should be consulted to establish operational frameworks for the new condominium corporation that will help create the operating budget and maintenance fees that will be associated with owning one of the condo units.

    The final steps include registering the stratified units with the city where the property is located and establishing the condo corporation, which manages maintenance and communal responsibilities. Throughout these stages, clear communication and coordinated efforts among all stakeholders ensure a smooth transition from a single dwelling to a multi-unit property, ultimately maximizing the property’s potential and value.

    Lawyers are indispensable in the stratification process, guiding property owners through the legal landscape to ensure compliance with municipal bylaws and provincial regulations. Their primary role is to facilitate the legal conversion of a single dwelling into multiple condominium units, which involves drafting and reviewing necessary legal documents.

    Lawyers ensure that all aspects of property division comply with zoning laws and building codes. They assist in obtaining necessary approvals and permits from local authorities, which is essential for the legal recognition of the new units. Moreover, they play a critical role in establishing the condominium corporation, outlining the rights and responsibilities of individual unit owners, and ensuring that governance structures are in place.

    Additionally, lawyers provide guidance on potential liabilities and help mitigate risks by ensuring that all legal obligations are met. Their expertise is crucial in avoiding costly legal disputes and ensuring a smooth transition throughout the stratification and ownership transfer process.

    The property management team plays a pivotal role in the stratification process by overseeing the operational aspects of the newly created condominium units. Their responsibilities include managing and budgeting the maintenance on-site, and ensuring that all units and common areas are maintained to high standards. This includes coordinating maintenance services, handling tenant inquiries, and overseeing repairs and improvements.

    Additionally, the property management team assists in establishing the condo corporation by helping to prepare budgets, set maintenance fees, and organize meetings for unit owners. They ensure that the building complies with safety regulations and municipal codes, and they facilitate communication between unit owners and the board of directors (which for a smaller strata are usually the same people)

    Their expertise in managing condo properties allows them to implement effective management strategies that enhance the living experience for residents while maintaining the property’s value. By handling these administrative and operational tasks, the property management team provides a seamless transition from a single dwelling to a multi-unit residential property.

    Surveyors are integral to the stratification process, providing precise measurements and assessments that form the foundation for successful property conversion. Their primary role is to delineate the property boundaries accurately, which is crucial for legal compliance and avoiding future disputes with neighbors. Surveyors prepare detailed site plans that reflect the existing layout and proposed changes, ensuring that the property meets zoning regulations and building codes.

    Moreover, surveyors assess the topography and structural aspects of the property, identifying any potential issues that might affect the stratification process. Their expertise helps in planning the division of the property into separate units, taking into account access, utility lines, and shared spaces.

    The accuracy of a surveyor’s work ensures that all subsequent legal documents, such as deeds and condominium plans, are based on reliable data. This accuracy is crucial for obtaining necessary permits and approvals from municipal authorities, ultimately facilitating a smooth transition from a single dwelling to a multi-unit residence.

    The role of your architectural partner is to take the zoning constraints of your property and maximize the layout of all of the allowable units on the property? Can your property allow for 4 units plus a garden suite? Or will you only be able to complete a fourplex or triplex? The architectural designer will review the zoning by-laws and the building code constraints to create a set of drawings that will be approved by the City and can be constructed as cost-effectively as possible (with your General Contractor’s feedback of course).

    Since the General Contractor’s services are going to make up the largest chunk of your investment in this project, it is important to create a true partnership with the company that will be helping you develop the property into separate dwelling units. It will be very important to get the General Contractor involved as early on in the process as possible because they will be able to give you the costing numbers you need and the building advice to ensure that you are not overspending and are getting the most value out of the construction of the new dwellings. Just remember that going with the cheapest quote is definitely not the right way to go about it, you usually get what you pay for and instead of dealing with delays, overspending, extras, and a poorly managed project just pay a bit of a premium and get it done right. This type of project is way too big to nickel and dime, save that for your smaller purchases that you can get away with cheaping out on.

    The marketability of the individual units will come down to a lot of factors, and have separate utilities is one of them. If you are able to separate the electrical, water, and natural gas (if applicable) for each of the units you are going to be able to create a completely individualized offering for each suite, so each unit holder can feel like they are paying for the other’s long showers. This does come at a premium but it is entirely worth the upfront cost and will allow you to create the most marketable units possible.

    Creating a condominium from a residential property in Toronto involves meeting specific minimum requirements to ensure compliance with local regulations. Firstly, the property must be zoned appropriately to allow for multi-unit residential development. Zoning bylaws dictate the number of units permitted on a property, and compliance is crucial to avoid legal complications.

    The property must also meet building code standards, which include specifications for safety, accessibility, and fire regulations. Each unit must be self-contained, with its own kitchen, bathroom, and sleeping area, ensuring it is habitable and marketable.

    Financially, establishing a condominium corporation is necessary. This involves drafting a declaration and bylaws, setting up a reserve fund for ongoing maintenance, and electing a board of directors to manage the corporation’s affairs.

    Finally, legal documentation, including a survey plan and building plans, must be submitted for municipal approval. Meeting these requirements ensures a legal framework for selling or leasing individual condominium units on a residential property.

    Stratifying a home into multiple condominium units involves several costs that homeowners need to consider. Initial expenses include legal fees for drafting the necessary documentation and obtaining municipal approvals. Engaging a property surveyor to provide accurate site plans is another essential expenditure. These professionals ensure compliance with zoning regulations and help avoid costly legal pitfalls.

    Construction costs for remodeling or building the property into separate units can vary significantly based on the scale of work required. This includes updating infrastructure to meet building codes and installing additional utilities to accommodate multiple dwellings.

    Additionally, there are costs associated with establishing a condominium corporation, such as setting up a reserve fund and insurance. Fees for property management services might also be necessary for ongoing maintenance and operations.

    Overall, while stratification can increase property value and generate income, it requires a substantial financial investment upfront. Careful budgeting and consultation with experts are crucial to managing these costs effectively. The upfront soft costs for retaining the right legal/property manager/surveyor team for successfully stratifying a property will be somewhere in the region of $150,000, but will change from project to project.

    Creating a condo corporation is a pivotal step in the process of stratifying a residential property. This legal entity is responsible for managing the common elements of the condominium, such as hallways, lobbies, and shared amenities. Establishing a condo corporation begins with the preparation of a declaration and bylaws, which outline the rules and regulations governing the property.

    The declaration specifies the division of ownership between individual units and common areas, while the bylaws detail the operational framework, including maintenance responsibilities and governance procedures. Once drafted, these documents must be registered with the local land registry office.

    The condo corporation also requires a board of directors, typically elected from among the unit owners. This board oversees the day-to-day management, including financial planning, maintenance, and dispute resolution. Usually for condo corporations as small as the ones that can fit on a residential property every unit holder is on the board, which means that it is important to have and maintain good relationships with all of your fellow condo owners!

    Setting up reserve funds is also a crucial element for covering future repairs and unforeseen expenses. Overall, the creation of a condo corporation ensures the organized management and sustainability of the stratified property.

    Yes, selling separate units on a residential property is possible through the process of stratification. This involves converting a single-family home into multiple condominium units that are individually owned and can be sold separately. However, several steps must be followed to ensure the process is legal. Firstly, the property must comply with local zoning laws, which dictate how many units can be created on a single lot.

    Once zoning compliance is confirmed, homeowners must establish a condo corporation. This requires drafting legal documents, such as a declaration, bylaws, and a description of the property division between units and common areas. Upon successful registration, each unit becomes a separate legal entity with its own title, enabling it to be sold independently.

    Selling individual units can maximize the property’s value and offer flexibility in real estate investment strategies, catering to different buyer needs within Toronto’s competitive housing market.

    To create a strata on residential property, a minimum of three condominium units is typically required. This allows for the establishment of a condo corporation, which is responsible for managing shared aspects of the property. The number of permissible units is largely governed by local zoning bylaws, which vary by region within Toronto. These bylaws dictate the density and type of housing that can be developed on a property, impacting the number of units you can legally create.

    Moreover, each unit must meet building code requirements, including separate entrances, kitchens, bathrooms, and living spaces, to be considered habitable and saleable. The creation of these units involves complex legal, financial, and construction considerations, necessitating the involvement of professionals like lawyers and surveyors.

    Understanding these minimum requirements is crucial for homeowners aiming to maximize their property’s potential by legally selling or leasing individual units, thereby tapping into Toronto’s growing demand for diverse housing options.

    Creating a separate apartment within your residential property and selling it as an independent unit is possible, but it involves several steps to ensure legality and compliance. The process typically requires converting the space into a condominium unit through stratification. This means each apartment must have its own kitchen, bathroom, and living area, meeting all building code standards.

    Following the steps above is crucial for legalizing the unit as a saleable entity. Working with legal professionals, surveyors, and property management experts (along with working with a competent architectural partner and General Contracting company) can streamline this process, helping navigate the complexities involved and reduce risk. Successfully converting and selling a separate apartment can unlock substantial property value and cater to Toronto’s diverse housing demands but the project needs to be evaluated with caution as there is a huge upfront investment.

    #1 – 319 Mortimer Avenue – (1,406 sq. ft. – main building)

    This unit was listed for $999,000 and I am assuming that it sold for around that amount (couldn’t find the sale details).

    #2 – 319 Mortimer Avenue – (501 sq. ft. – main building)

    This unit is the basement unit and sold for $375,000.

    #3 – 319 Mortimer Avenue – (1,895 sq. ft. – main building)

    This unit sold for $1,200,000 and is the upper unit of the triplex main building. It is the largest of the three units.

    #4 – 319 Mortimer – 1,286 sq. ft. Garden Suite

    This standalone garden suite unit sold for $1,100,000.

    Key Takeaways from this Property Development and Sale

    1. The total revenue from the units (assuming suite 1 sold for $999,000) was $3,674,000 (this is before lawyer’s fees, real estate transaction fees, etc.). Let’s say the take-home revenue was $3,450,000 after transaction fees.

    2. The construction costs for building something like this (if we built it) would be somewhere in the region of $1,900,000 to $2,100,000 (inclusive of taxes, finishes, and utility upgrades). Again this will change from builder to builder but this gives you an idea of the relative construction costs for a project like this.

    3. In talking with a real estate lawyer well-versed in these types of transactions, they estimate the cost of creating the condominium corporation and coordinating between the property management team and surveyor will cost around $150,000 in soft costs.

    4. Depending on who you work for on the design side the design and permitting costs can vary widely, but if you used one of our permit designers you would expect to pay around $20,000-$30,000, not including the permit fees (but they can pretty easily be estimated when you get the design work quoted, likely wouldn’t be more than $10,000).

    So in summary, the input costs are $1,900,000 to $2,100,000 for construction/utilities, $150,000 for lawyers/surveyors/property management services, and design/permit fees of $30,000-$40,000. This brings the total cost of this project to $2,080,000 to $2,290,000. If you do the math between the costs and the revenue generated from the sale of the 4 separate units you get a profit of somewhere between $1,160,000 to $1,370,000. The only other item that I can think of that wasn’t accounted for is the purchase price of the property. If the property was purchased (versus being developed as an already owned property) the profit numbers would likely dip down to a couple hundred thousand dollars (which would not be worth it in my opinion).

    This project also begs the question, could the entire property have sold for the same amount? I don’t think that matters, because what splitting up this property did is it allowed for a lower barrier to entry into a completely new home. Not many people can afford a 3 million dollar + property, but many people can afford a property around 1 million dollars. The point we are trying to make is that there is an incentive to split the units up because you get a larger pool of potential buyers for each.

    P.S. if you developed this property, let me know how close I am in my cost estimates!

    Stratifying a residential property offers numerous potential benefits for homeowners and real estate investors. One of the foremost advantages is the ability to increase property value by converting a single dwelling into multiple, marketable units. This transformation not only enhances the property’s appeal to potential buyers but also allows owners to generate additional income through sales or rentals.

    Moreover, stratification enables property owners to better utilize their land, particularly in urban areas like Toronto, where space is at a premium. By creating more housing units, homeowners can contribute to alleviating the city’s housing shortage while maximizing their investment.

    Additionally, stratification allows for greater flexibility in real estate strategies, offering the opportunity to diversify income streams. It also potentially leads to tax advantages, as separate units can be assessed individually. Overall, stratification represents a strategic approach to property management and investment, aligning with the evolving demands of Toronto’s dynamic housing market.

    Making informed decisions is crucial when considering the stratification of a residential property. Homeowners must evaluate the feasibility of such a project, taking into account zoning regulations, construction costs, and potential market demand. Engaging with legal, financial, and real estate professionals is essential to navigate the complexities of the process and ensure compliance with all regulatory requirements.

    Conducting a thorough financial analysis will help determine the expected return on investment. This should include a detailed budget that considers initial construction and legal costs, ongoing maintenance, and potential income from unit sales or rentals.

    Furthermore, understanding the local real estate market and demand for multi-unit properties in Toronto is vital. This insight can guide decisions regarding unit design, pricing, and marketing strategy.

    By carefully assessing these factors and seeking expert guidance, homeowners can make strategic decisions that align with their financial goals and contribute to the successful transformation of their property into a profitable multi-unit residential development.

    Consulting with industry experts is a vital step when planning to stratify a residential property in Toronto. Professionals such as real estate lawyers, surveyors, and property management consultants provide essential insights and guidance throughout the process. Their expertise ensures that all legal and regulatory requirements are met, helping to avoid potential pitfalls and delays.

    Real estate lawyers play a crucial role in drafting necessary documents and facilitating approvals, while surveyors provide accurate property assessments and site plans. Property management teams offer valuable advice on operational aspects and help establish effective management practices for the newly created condo corporation.

    Additionally, consulting with financial advisors can aid in understanding the economic implications of stratification, ensuring that the project aligns with financial goals and maximizes return on investment. By engaging with these experts, homeowners can make informed decisions and navigate the complex stratification process with confidence, ultimately achieving a successful transformation of their property.

    BVM Contracting can help evaluate whether or not your property is a good candidate for creating a multi-unit development, and can help you future-proof your investment by setting up all of the units so they can eventually be stratified at a later date. We are in the process of completing the required courses to get certified by Tarion and the HCRA to be able to build these homes for sale but are not yet able to do so. By middle of 2025 we should be registered and ready to give you the best advice for stratifying the your property.

    About BVM COntracting

    BVM Contracting is a full-service General Contractor or Home Builder located in Toronto. We provide home renovation and building services for major home renovations (kitchen renovations, bathroom renovations, basement renovations, full interior renovations, home additions, lot severances, and new home construction). Our goal is to help guide our clients through the process of renovating their home, from concept to completion.

    Further than providing General Contracting and Project Management for major home renovations, we also offer value-added services such as renovation financing, renovation rebate consultations and services, building permit and design services, smart home installation services, and real estate investor services.

    To learn more about our offering by visiting our services page.

  • Understanding Ontario Regulation 462/24: Additional Residential Units in Toronto

    Understanding Ontario Regulation 462/24: Additional Residential Units in Toronto

    Understanding Ontario Regulation 462/24: Additional Residential Units in Toronto (Updated May 2025)

    Ontario Regulation 462/24 is a pivotal update for homeowners and developers looking to add Additional Residential Units (ARUs), also known as Accessory Dwelling Units (ADUs), to their properties. This regulation introduces new standards that simplify the process of adding ARUs, making it more accessible for property owners across the province. It is important to note that municipalities like the City of Toronto are still working through how to implement the regulation, and in some key areas, they’re not adopting all the proposed changes outlined in the O. Reg 462/24.

    This blog outlines the key aspects of O. Reg. 462/24, updates to Toronto’s zoning bylaws, and how homeowners and developers can take advantage of these new provisions.

    Key Updates in Ontario Regulation 462/24

    The most significant changes brought by Ontario Regulation 462/24 include:

    Applicability and Unit Limits

    The regulation applies to properties that are proposed to contain a maximum of three residential units. This includes:

    • A second residential unit in the primary home plus a garden or laneway suite.

    • A third unit within the primary dwelling (without an additional garden or laneway suite).

    • A garden or laneway suite where the primary home contains no more than two units.

    It is important to note that properties exceeding three residential units (e.g., triplexes adding a laneway suite or a fourplex) do not qualify under this regulation and will continue to be governed by Zoning By-law 569-2013.

    Reduced Setback Requirement

    The new regulation mandates a minimum separation distance of 4 metres between an ARU and any other residential building on the same lot. However, the City of Toronto retains the ability to enforce greater separation distances where necessary.

    For example, if the required distance is only 4 metres, the maximum height for an ARU remains 4 metres.

    In cases where a 7.5-metre separation is achieved, taller ARUs may be permitted, consistent with existing garden and laneway suite height restrictions.

    Elimination of Angular Planes

    The angular plane requirement, which previously restricted the height and shape of ARUs to minimize shadowing on adjacent properties, has been removed entirely. This change simplifies the design process and opens the door for more creative and functional unit layouts (especially for the second level of these garden suites and laneway suites).

    Lot Coverage and Floor Space Index (FSI)

    The total lot coverage for all buildings and structures is capped at 45%.

    There is no longer a maximum floor space index (FSI) for lots containing an ARU, making it easier to maximize living space within existing zoning setbacks and height restrictions.

    Impact: This change enables homeowners to build larger secondary units without FSI limitations, aligning with previous regulations for multiplexes, garden suites, and laneway suites.

    By-Law Interactions & Implementation

    When Do These Changes Apply?

    The updated regulation is immediately applicable as of November 20, 2024 to:

    • New Committee of Adjustment applications received after November 20, 2024.

    • New building permit and zoning review applications.

    • New zoning by-law amendment applications.

    • Existing variance applications where no decision has been made.

    • Existing building permit applications where permits have not been issued.

    Does the City Of Toronto’s Zoning By-law Prevail?

    The short answer is no, the City of Toronto has taken the O. Reg and made the following changes to the zoning by-law for garden suites:

    🔺 Angular Plane Rules Removed

    The City has eliminated the angular plane requirement for garden and laneway suites. Applications must still comply with existing angular plane limitations — the City has not worked around this provision of the regulation, and building permits continue to reflect this constraint.

    ↔️ Separation Distance From Main House: No Change for Taller Builds

    While the province introduced a potential 4-metre minimum setback from the main house, the City of Toronto is not applying this for buildings taller than 4 metres. For builds that are 6m to 6.3m tall, the separation requirement remains at 7.5 metres, with one exception:

    Ward 19 garden suites may continue to follow a 5-metre setback rule.

    ✅ 4-Metre Separation Now Allowed for 4m-Tall Builds

    For garden or laneway suites that are 4 metres or less in height from grade, Toronto is accepting a 4-metre separation from the main house. This is a slight relaxation from the previous 5-metre minimum and aligns with the regulation.

    🚫 No Application Behind Triplexes or Larger

    Wanted to reiterate this since it is something that is important in Toronto as well. None of the provisions in Ontario Regulation 462/24 apply to lots where the main building is a triplex or larger. These lots are not eligible for the streamlined permissions introduced by the regulation — a key limitation for multi-unit properties.

    What This Means for Toronto Homeowners

    Faster approval times due to fewer zoning hurdles.

    Increased housing options through garden suites and laneway suites.

    More flexibility in design without angular plane restrictions.

    Maximized lot use with no FSI restrictions.

    Clear separation distance requirements for new builds.

    If you’re considering building an additional residential unit, now is the time to explore how these regulatory changes can work in your favor. Contact BVM Contracting today to discuss your project and navigate these new rules seamlessly.

    Benefits of Ontario Regulation 462/24 for Toronto Residents

    1. Increased Housing Opportunities

      The regulation supports the creation of more rental units, helping to address Toronto’s ongoing housing affordability challenges.

    2. Simplified Design and Construction

      By eliminating angular planes and reducing setbacks, property owners can more easily design ARUs, including Garden Suites and Laneway Suites, that fit within their lot’s footprint.

    3. Enhanced Property Value

      Adding an ARU can significantly increase a property’s value by providing additional living or rental space.

    Why Toronto is Embracing Garden Suites and Laneway Suites

    Garden Suites and Laneway Suites have become increasingly popular as practical solutions for expanding housing options in Toronto. These structures allow homeowners to optimize their properties while adhering to updated Toronto Zoning Requirements for Garden Suites and Laneway Suites. With the elimination of angular planes, constructing a Garden Suite or Laneway Suite has become more straightforward and accessible.

    Why Choose BVM Contracting for Your Garden Suite or Laneway Suite Project?

    At BVM Contracting, we specialize in building Additional Residential Units, including Garden Suites and Laneway Suites in Toronto. Our team is well-versed in navigating municipal regulations, including Ontario Regulation 462/24, to ensure your project is compliant and seamlessly executed.

    Expertise in Toronto Zoning

    We’re up-to-date with the latest Toronto Zoning Requirements for Garden Suites and Laneway Suites and can help you adjust existing applications to reflect the new setback and design standards.

    Customized Solutions

    Whether you’re looking to add a rental unit or expand your living space, we deliver tailored solutions that meet your unique needs.

    End-to-End Services

    From design and permitting to construction, we handle every aspect of your Garden Suite or Laneway Suite project.

    Honest and fair pricing

    We will give you the actual costs to build a garden suite or laneway suite in Toronto because we have the data from our past projects and like to manage expectations early on in the pre-construction process to ensure that we create customers for life. We also have a portfolio of pre-fabricated garden suite plans that can help you save some money on your accessory dwelling unit project.

    Frequently Asked Questions (FAQs)

    Are angular planes removed from Garden Suites and Laneway Suites in Toronto?

    Yes, the angular plane requirement has been removed under Ontario Regulation 462/24, simplifying the design and construction process for Garden Suites and Laneway Suites in Toronto. This has been confirmed with a representative from the City of Toronto and will apply to current and future applications.

    What is the new setback requirement for Garden Suites and Laneway Suites in Toronto?

    The new setback requirement is a minimum 4 meters between the primary dwelling and the Garden Suite or Laneway Suite, but comes with restrictions for building height (as mentioned above)

    Do I still need a building permit for a Garden Suite or Laneway Suite in Toronto?

    Yes, you must apply for a building permit. However, the updated regulation simplifies compliance and expedites the approval process.

    Can I adjust my existing application to reflect the new regulations?

    Yes, existing applications can be revised to align with the 4-meter setback and removal of angular planes.

    Who can benefit from these updates?

    Homeowners with properties containing up to three living units, such as two units within the main house and one Garden or Laneway Suite, can take advantage of these changes.

    Start Your Garden Suite or Laneway Suite Project Today

    Contact BVM Contracting today to learn more about how Ontario Regulation 462/24 can benefit your property. Together, we can help you create a functional and stylish Garden Suite or Laneway Suite that enhances your property’s value and utility.

    About BVM COntracting

    BVM Contracting is a full-service General Contractor or Home Builder located in Toronto. We provide home renovation and building services for major home renovations (kitchen renovations, bathroom renovations, basement renovations, full interior renovations, home additions, lot severances, and new home construction). Our goal is to help guide our clients through the process of renovating their home, from concept to completion.

    Further than providing General Contracting and Project Management for major home renovations, we also offer value-added services such as renovation financing, renovation rebate consultations and services, building permit and design services, smart home installation services, and real estate investor services.

    To learn more about our offering by visiting our services page.

  • Overcoming Fire Hydrant Constraints for ADU’s in Toronto

    Overcoming Fire Hydrant Constraints for ADU’s in Toronto

    Toronto’s Hidden Garden Suite Obstacle: The Fire Hydrant Factor

    Toronto’s urban landscape is evolving. Garden suites offer a promising solution to housing challenges, but a hidden obstacle often stands in the way: fire hydrant proximity.

    Many homeowners are unaware that their dream of building a garden suite hinges on a crucial safety requirement. In Toronto, garden suites must be within 45 meters of a fire hydrant. This seemingly simple rule can make or break your backyard development plans.

    The Garden Suite Revolution

    Since February 2022, Toronto has embraced garden suites as an innovative housing solution. These self-contained residential units, built in backyards, offer new possibilities for homeowners and investors alike.

    The benefits are clear:

    • Increased housing options in established neighborhoods

    • Potential rental income for homeowners or closer proximity to family

    • Efficient use of existing urban space

    But the path to realizing these benefits isn’t always straightforward.

    The Fire Hydrant Conundrum

    Fire safety is paramount in urban planning. The 45-meter rule ensures that firefighters can quickly access water in emergencies. But for many Toronto properties, this requirement poses a significant challenge.

    Consider this: Your property might be perfect for a garden suite in every other way. Ample space, great location, already-upgraded utilities. But if the nearest fire hydrant is 50 meters away, your project hits a wall before it even begins.

    Innovative Solutions for Ambitious Homeowners

    At BVM Contracting, we specialize in turning obstacles into opportunities. When it comes to fire hydrant constraints, several strategies can keep your garden suite dreams alive:

    1. Residential Fire Sprinkler Systems

    Installing a residential fire sprinkler system can provide an alternative means of fire protection. This solution often allows for greater flexibility in garden suite placement.

    2. Strategic Design and Placement

    Our expert team analyzes your property to maximize options within existing constraints. There are ways to add density to your property without adding a garden suite or laneway suite, and we can help you work through what your best options are!

    3. Collaborate with the City

    In some cases, working with Toronto Water to install a new fire hydrant near your property may be possible. While this involves additional steps, it can unlock significant development potential. We created a video that goes into more detail about this option, and if you have any questions, please feel free to reach out!

    The BVM Contracting Advantage

    Navigating fire safety regulations is just one aspect of successful garden suite development. Our approach goes beyond problem-solving to create truly exceptional living spaces:

    • Thorough pre-construction services at no charge

    • A comprehensive database of past projects to inform your decisions

    • Expert guidance through every stage of the process

    We believe that informed homeowners make better decisions. That’s why we prioritize education and transparency in every project we undertake.

    Turning Constraints into Opportunities

    The fire hydrant rule isn’t just a challenge. It’s an opportunity to innovate, to think creatively about urban development. With the right approach, these constraints can lead to more thoughtful, safer, and more valuable garden suite projects.

    At BVM Contracting, we see beyond the immediate obstacles. We envision the potential of your property and work tirelessly to realize it.

    Your Next Steps

    Are you considering a garden suite project in Toronto? Don’t let fire hydrant constraints dampen your enthusiasm. With expert guidance and innovative solutions, your backyard can become a valuable asset in Toronto’s evolving urban landscape.

    Reach out to BVM Contracting today. Let’s explore how we can turn your garden suite dreams into reality, navigating every challenge with expertise and creativity.

    Together, we can build a smarter, more vibrant Toronto, one garden suite at a time.

    About BVM COntracting

    BVM Contracting is a full-service General Contractor or Home Builder located in Toronto. We provide home renovation and building services for major home renovations (kitchen renovations, bathroom renovations, basement renovations, full interior renovations, home additions, lot severances, and new home construction). Our goal is to help guide our clients through the process of renovating their home, from concept to completion.

    Further than providing General Contracting and Project Management for major home renovations, we also offer value-added services such as renovation financing, renovation rebate consultations and services, building permit and design services, smart home installation services, and real estate investor services.

    To learn more about our offering by visiting our services page.

  • Unexpected Home Building Costs in Toronto

    Unexpected Home Building Costs in Toronto

    Home Building Costs You Should Account for (but probably won’t)

    You’ve finally decided to build your dream home in Toronto. But hold on—are you sure you’ve accounted for everything?

    As a Toronto-based residential construction company, we’ve seen it all. And trust us, there’s more to budgeting for your dream home than meets the eye.

    Let’s break down the hidden costs that catch Toronto homeowners off guard. Buckle up—this might change your entire project plan.

    The Landscaping Blindside

    Picture this: Your beautiful new home is complete, but it’s surrounded by a muddy wasteland. Oops.

    Landscaping is often the forgotten stepchild of home building projects. Many homeowners pour their budget into interiors, forgetting about the outdoors entirely.

    Here’s a shocker: Landscaping can cost between 5% to 20% of your home’s value. For a $1 million Toronto home, that’s potentially $200,000 depending on how deep you want to go down the landscaping rabbit hole. The bottom line is that Landscaping costs can vary widely based on your property and desires.

    Our advice? Factor in landscaping from the start. It’s not just about aesthetics—proper landscaping protects your foundation and can even increase your home’s value. If you have to save the landscaping as a “phase 2” of your overall plans with your property that is fine as well, but we can help you understand what costs to account for so you enter your project with a plan.

    The Utility Upgrade Surprise

    Now, let’s talk about something that blindsides almost every Toronto homeowner: utility upgrades.

    Building a new home in Toronto? Prepare for mandatory water service upgrades. These can cost between $35,000 to $45,000. Yes, you read that right.

    About $26,000 of that goes straight to the city for their side of the work. The rest? That’s on you for the private side upgrades. Toronto’s water service replacement costs can be a real budget-buster if you’re not prepared.

    Don’t forget about electrical upgrades. New builds typically require an upgrade to 200 amp service, costing around $4,500 to $5,000.

    The takeaway? Always factor in utility upgrades when budgeting for a new build in Toronto. It’s not optional—it’s mandatory. BVM Contracting includes this in all of our budgets to set the proper expectations right from the start! For Home Additions and Accessory Dwelling Units (ADU’s) these upgrades are not mandatory but may be needed depending on how everything on site is currently configured. BVM Contracting can help you determine what upgrades will be needed no matter what type of residential project you want to take on!

    The Temporary Relocation Conundrum

    Here’s something many homeowners overlook: Where will you live during the renovation or home building project?

    If you’ve owned your home for a while, you might be in for a shock when you see current rental prices in Toronto. Many of our clients end up bunking with in-laws to avoid the sky-high rental costs.

    But it’s not just about the money. Consider the impact on your daily life. Will your kids be further from school and not close to friends? How will it affect your commute?

    Pro tip: Factor in at least 6-12 months of alternative living arrangements when planning a major renovation or new build. Your sanity (and your in-laws) will thank you.

    BVM Contracting builds homes fast, so for a new home build you will be back in your home within 1 year (maybe even faster, our record is a 7-month new home build for one of our clients)

    The Furnishing Faux Pas

    You’ve built your dream home. Now you need to furnish it. Surprise! Your old furniture doesn’t quite fit the new space.

    We always recommend budgeting at least $5 per square foot for furnishings. For a 2,000 square foot home, that’s an extra $10,000 minimum.

    Remember, your new dining room might be larger than your old one. That cozy loveseat might look tiny in your new, spacious living room. Budget accordingly.

    The Zoning Zone-Out

    Toronto’s zoning bylaws can be a maze. Many homeowners don’t realize they might need to go through the Committee of Adjustment for variances to seek relief from existing zoning constraints on their property. This not only adds additional costs but also adds a lot more time to the process of getting a permit, and time is money!

    Sometimes, it’s more cost-effective to work within existing setbacks by completing a home addition or other type of project on your property rather than resorting to a new home build. We’ve saved clients thousands by navigating these regulations smartly with our architectural partners and can help you evaluate your property’s unique zoning to determine what your best options are!

    The Ground Beneath Your Feet

    Toronto’s soil conditions can vary wildly. Some areas, like East York, are known for sandy soil. This can mean additional foundation work—and additional costs.

    We always recommend a soil evaluation before starting a project. It might cost a bit upfront, but it can save you from nasty (and expensive) surprises down the line. The good news is this is a mandatory part of our pre-construction process with all of our clients, so you will be in good hands!

    The All-Electric Option

    Thinking of going all-electric? It’s becoming more popular in Toronto, thanks to advancements in cold-climate heat pumps and more efficient electrical appliances.

    While it doesn’t usually affect utility upgrade requirements, it does mean a higher upfront cost for HVAC equipment. But many homeowners find the long-term energy savings worth it.

    Just remember to factor in a backup power source. Toronto winters and power outages don’t mix well!

    The Pre-Construction Prescription

    So, how do you avoid these budget-busting surprises? It all comes down to thorough pre-construction planning.

    At BVM Contracting, we start conversations with clients before they commit to the design stage with an architect or permit designer. We walk with you through the entire process, identifying potential pitfalls and hidden costs along the way. Every project has its unique conditions and requirements, but we will be able to expertly walk you through all of the potential snags and account for everything so you feel confident going into the construction phase.

    We keep a pulse on project costs as designs develop. This allows our clients to make informed decisions about design elements, knowing exactly how they’ll impact the bottom line.

    Remember, the biggest cost overruns come from a lack of builder feedback during the design process. Don’t assume every design decision will fit your budget—check and double-check.

    The Bottom Line

    Building or renovating in Toronto is exciting, but it’s also complex. Hidden costs lurk around every corner, ready to blow your budget.

    The key? Knowledge and preparation. By understanding these potential costs upfront, you can plan more effectively and avoid unpleasant surprises.

    Remember, a dream home isn’t just about the end result. It’s about the journey to get there. Make sure yours is as smooth and stress-free as possible by planning for these hidden costs from the start.

    Ready to start your Toronto home building journey? Let’s talk. We’re here to help you navigate every hidden cost and unexpected challenge along the way.

    About BVM COntracting

    BVM Contracting is a full-service General Contractor or Home Builder located in Toronto. We provide home renovation and building services for major home renovations (kitchen renovations, bathroom renovations, basement renovations, full interior renovations, home additions, lot severances, and new home construction). Our goal is to help guide our clients through the process of renovating their home, from concept to completion.

    Further than providing General Contracting and Project Management for major home renovations, we also offer value-added services such as renovation financing, renovation rebate consultations and services, building permit and design services, smart home installation services, and real estate investor services.

    To learn more about our offering by visiting our services page.

  • How to Navigate Toronto’s Interactive Zoning Map

    How to Navigate Toronto’s Interactive Zoning Map

    Navigating Toronto’s Zoning Map: A Guide for Homeowners and Developers

    Understanding Toronto’s zoning regulations is crucial for homeowners, developers, and investors aiming to maximize their property’s (or a speculative property’s) potential. The City of Toronto’s zoning by-laws dictate land use, building types, and development possibilities for different property types all across the City. Navigating these regulations can be complex, but tools like the City of Toronto’s Interactive Zoning By-law Map and services from experts such as BVM Contracting can simplify the process.

    Learn more about how to use The City of Toronto’s interactive zoning by-law map to start your home-building journey at your property.

    P.S. We help homeowners and investors complete a comprehensive zoning analysis with our vetted architectural partners. Book your free zoning analysis today!

    🗺️ How to Use Toronto’s Interactive Zoning By-law Map

    The City of Toronto offers an Interactive Zoning By-law Map that allows users to explore zoning information for specific properties. Here’s how to utilize it effectively:

    1. Access the Map: Visit the City of Toronto’s official website and locate the Interactive Zoning By-law Map.

    2. Search for a Property: Enter the address or use the map’s navigation tools to find the property of interest.

    3. Interpret Zoning Codes: Each property is labeled with a zoning code (e.g., “R” for Residential, “CR” for Commercial Residential). These codes determine the permissible uses and development standards for the property.

    4. Review Detailed Information: Clicking on a property reveals detailed zoning information, including permitted uses, property-specific exemptions, and other important regulations.

    5. Measuring Property and Home Areas Using the Map. The tool also allows you to measure the area and length of the property of interest, which can help you evaluate the property preliminarily before getting an updated survey.

    6. Review the Legend to Find Important Information. The software has a legend where you can find the height restrictions, lot coverage, number of storeys, and a few other items that are helpful.

    For a visual guide on using the Interactive Zoning By-law Map, refer to our video above for a crash course! There is of course more information that you can dive into but we will need to create a secondary video to explain how to do that!

    🏗️ Utilize BVM Contracting’s Free Zoning Analysis

    BVM Contracting offers a complimentary zoning analysis service for Toronto properties, which helps homeowners and developers understand the development potential of their properties. This service is best utilized by properties that would like to add to their existing structure (i.e. a home addition), create an entirely new structure (i.e. new home build), or add density to their property (i.e. garden suites, laneway suites, multi-unit developments, major streets by-law). This service includes:

    • Zoning Assessment: Evaluating current zoning designations and what the property permits

    • Development Potential: Identifying opportunities for additions, new construction, or additional density based on the zoning regulations for your neighbourhood and property.

    • Regulatory Updates: Informing clients about recent changes or future developments in zoning laws, such as Ontario Regulation 462/24, which affects garden suites and laneway suites, or the Major Streets By-law (which will add additional density to major streets throughout Toronto.

    By leveraging BVM Contracting’s expertise, property owners can make informed decisions and access their partner network of expert architectural partners to help guide decision making for development of their property (or properties).

    🏡 Unlock Your Property’s Potential

    Understanding and navigating Toronto’s zoning regulations is essential for maximizing property value and development opportunities. Utilizing The City of Toronto’s Interactive Zoning By-law Map provides a foundational understanding, while consulting with experts like BVM Contracting offers personalized insights and guidance.

    Whether you’re considering a home addition, new home build, an accessory dwelling unit (ADU), or embarking on a multi-unit development project in Toronto, the Toronto Zoning Map will be an invaluable tool for you and your project team to utilize.

    Start Your Residential Construction Planning Today

    Contact BVM Contracting today to get your comprehensive zoning analysis completed for your property in Toronto. Together, we can help you understand how to best approach the development of your property (or future property). Book your free zoning analysis and property consultation today!

    About BVM COntracting

    BVM Contracting is a full-service General Contractor or Home Builder located in Toronto. We provide home renovation and building services for major home renovations (kitchen renovations, bathroom renovations, basement renovations, full interior renovations, home additions, lot severances, and new home construction). Our goal is to help guide our clients through the process of renovating their home, from concept to completion.

    Further than providing General Contracting and Project Management for major home renovations, we also offer value-added services such as renovation financing, renovation rebate consultations and services, building permit and design services, smart home installation services, and real estate investor services.

    To learn more about our offering by visiting our services page.

  • Attached Secondary Suites Versus a Garden or Laneway Suite

    Attached Secondary Suites Versus a Garden or Laneway Suite

    As Toronto continues to embrace gentle density and the expansion of low-rise housing options, many homeowners and investors are exploring how best to add a secondary unit to their property. While garden suites and laneway suites are popular choices, there’s another smart solution that is sometimes overlooked: adding a secondary suite through a rear extension or home addition to your main dwelling.

    In this blog, we’ll explore when a secondary suite addition might be a better fit than building a detached structure like a garden or laneway suite.

    What Is a Secondary Suite Through a Rear Extension or home addition?

    A secondary suite is a self-contained residential unit located within or attached to a primary dwelling. In the case of a rear extension, this means building additional living space at the back, side or front of your home that includes its own kitchen, bathroom, and entrance. You can also look to add a secondary suite by completing a home addition which would add an additional level above your existing home.

    This type of addition can offer all the functionality of a detached accessory dwelling unit (ADU), but without the costs and challenges of a standalone build.

    When Is a Rear Extension the Better Option?

    1. Your Property Is Too Far from a Fire Hydrant

    According to Toronto’s fire code, detached garden and laneway suites must be within a certain distance of a municipal fire hydrant. If your backyard is beyond that distance, adding a rear extension instead of a detached unit is often the only viable way to add a second unit legally.

    By attaching the new suite to the main home, you avoid the need for costly fire suppression systems like sprinkler installations.

    2. Budget Constraints

    Detached garden and laneway suites often require:

    • Additional site servicing (water, sewer, and electrical lines)

    • Separate foundations

    • Additional architectural and engineering fees

    These costs can quickly add up and sometimes can make the project cost-prohibitive. A rear extension typically shares infrastructure with the main house and can share walls, reducing complexity and lowering construction and permitting costs.

    3. You Want to Maximize Indoor Living Space

    Unlike detached ADUs, which are physically separate from your house, a secondary suite built via a rear extension or home addition can feel more integrated into your property. This can be ideal for multi-generational living situations or for rental units that feel like part of the primary residence.

    4. Your Property Doesn’t Qualify for a Garden or Laneway Suite

    Some properties don’t meet the City of Toronto’s zoning requirements for detached units. Whether it’s the size of the lot, the layout of the rear yard, or lack of rear laneway access, many homeowners are blocked from building a garden suite or laneway suite. In these cases, a rear extension or addition to create a secondary suite is often the best (or only) path forward.

    BVM Contracting: Your Partner in Smart Secondary Suite Design

    At BVM Contracting, we help Toronto homeowners navigate the complexities of building new units to your property—whether that is through rear extensions, garden suites, or laneway suites.

    We handle:

    • Design and architectural planning with our vetted list of permit designers and architects

    • Zoning review and permit acquisition

    • Cost-efficient construction strategies and guidance throughout the pre-construction process

    Our team can help you determine which option is best for your property based on your goals, lot conditions, and budget.

    Why Choose BVM Contracting for Your Accessory Dwelling Unit or Secondary Suite Project?

    At BVM Contracting, we specialize in building many different types of structures, including home additions, laneway suites, garden suites, basement apartments, new home builds, and more! We have a lot of tools in our toolbelt and can listen to your needs to determine which type of project will make the most sense given your budget constraints and wishlist. We are not just a one-trick pony that will force a solution down your throat. We also possess the following strengths to help ensure an efficient pre-construction and construction process.

    Expertise in Toronto Zoning

    We’re up-to-date with the latest Toronto Zoning Requirements for Multi-unit development in Toronto and can help you craft a design that will fit all or most of your requirements within your desired budget.

    Customized Solutions

    Whether you’re looking to add a rental unit or expand your living space, we deliver tailored solutions that meet your unique needs and actually listen to you.

    End-to-End Services

    From design and permitting to construction, we handle every aspect of your residential construction project in Toronto.

    Honest and fair pricing

    We will give you the actual costs to build whichever project works for your budget and needs in Toronto. We have the data from our past projects and like to manage expectations early on in the pre-construction process to ensure that we create customers for life.

    Conclusion: Choose the Right configuration of secondary for Your Needs and lot constraints

    While garden suites and laneway suites are exciting opportunities for increasing your property’s value, they’re not right for every home and property in Toronto. A secondary suite built through a rear extension or addition can be a more practical, affordable, and permitted solution for many Toronto homeowners.

    To explore your options, contact BVM Contracting today. We’ll help you create a plan that fits your space, your needs, and your future. Book your free zoning analysis and property consultation to determine what options you have to add gentle density to your property!

    About BVM COntracting

    BVM Contracting is a full-service General Contractor or Home Builder located in Toronto. We provide home renovation and building services for major home renovations (kitchen renovations, bathroom renovations, basement renovations, full interior renovations, home additions, lot severances, and new home construction). Our goal is to help guide our clients through the process of renovating their home, from concept to completion.

    Further than providing General Contracting and Project Management for major home renovations, we also offer value-added services such as renovation financing, renovation rebate consultations and services, building permit and design services, smart home installation services, and real estate investor services.

    To learn more about our offering by visiting our services page.

  • Step-by-Step Planning Guide For Home Building Projects in Toronto

    Step-by-Step Planning Guide For Home Building Projects in Toronto

    Step-by-Step Planning Guide for Your Major Renovation or Home Building Project in Toronto

    Embarking on the journey to build your dream home is an exciting but sometimes daunting process if you are unsure of how and where to start. As Toronto’s leader in quality home renovations and home building, we’ve taken the time to outline a step-by-step guide to help you feel prepared to navigate this journey smoothly.

    By following these steps, you’ll ensure that your home-building project proceeds without unnecessary hitches, leading to a successful and seamless path to your dream home. We at BVM Contracting are here to support you every step of the way!

    Who is this guide for?

    This guide is for anyone interested in completing a substantial renovation or home building project for their property (or properties) in Toronto. This guide will be helpful for others outside of Toronto but some of the steps are geared towards how Toronto handles building permit applications.

    welcome to The Process to successfully Planning your dream home building project in Toronto

    Step 1: Reach out to a Local General Contractor or Home Builder

    The first step in your home planning journey is to find reputable General Contractors (GC) or Home Builders to bring through the process. This is crucial as a reliable Contractor will help streamline the entire process. Ensure they have:

    • Compliance with local regulations

    • Appropriate insurance and WSIB coverage

    • A solid and fair Contract

    • Proven past project experience

    Don’t hesitate to ask for all this information upfront, a trustworthy Builder will have no issue providing it. Confirming their credibility early on will make the rest of the process much smoother. You will want to try to create a short list of companies based on which companies you feel will be able to help you through the remaining steps.

    Be wary of the companies that require you to pay them a retainer to commit to working with them before they provide you any understanding of project costs. Would you buy a house without knowing the purchase price? Don’t get sucked into high-pressure sales tactics, do yourself a huge favour and start the planning process way before you want to start your project so you don’t fall victim to the “I’m booking up quick” sales tactics and the other slime-ball tactics builders use to get you locked into a contract with them.

    Cost of Step 1 with BVM Contracting: $0

    Step 2: Completing a preliminary Zoning Review

    Before you can start planning the specifics of your home renovation or home-building project, you will need to understand what is possible to complete on your property. Some common questions include:

    • How high can I build?

    • How many storeys or levels can I build?

    • How far back can I extend?

    • How much building coverage am I allowed on my property?

    • How far away from the property line am I allowed to build?

    • How many units can I build?

    A zoning review will determine the limitations and possibilities for your project based on Toronto’s and the GTA’s local regulations. Every neighbourhood has a different set of zoning by-laws that dictate what you can and can’t do on your property. At BVM Contracting, we ensure that a preliminary zoning review is completed as soon as possible to determine what you can do on your property. This serves many helpful purposes:

    • It allows us to set expectations with our clients very early on in the process about the potential roadblocks to certain projects on their property and if Committee of Adjustment may be needed

    • It allows us to hone in on the preliminary scope of work for the project which helps us in Step 3.

    • It allows us to get our trusted permit designers and architects involved to evaluate the proposed project and provide a second set of eyes to determine project feasibility.

    If the client wants to complete a project on their property that is going to result in a zoning bylaw variance that will push the project application to Committee of Adjustment, we will let them know what the additional steps are during the permitting process and will usually only proceed if there is a good chance of getting the variances approved at C of A. Every client has a different risk tolerance so we try to take this time to determine how much of a risk the client is willing to take to get their proposed project approved.

    If it is determined that there will be no zoning bylaw variances then we glide swiftly into Step 3. The word “Preliminary” is put into the title of this step because the zoning review is usually completed without an updated survey of the property. Brownie points if you have an up-to-date topographic survey of your property in question, but it is by no means necessary at this point as we can pull data from the Toronto zoning map to estimate the size of your parcel of land.

    The preliminary zoning review will take a couple of weeks at its longest to be completed, sometimes even faster depending on how well your General Contractor works with their design partners.

    Cost of Step 2 with BVM Contracting: $0

    Step 3: Get Estimated Costing Information From General Contractor or home builder

    Once you understand the zoning limitations of your property, getting estimated costing information from a General Contractor is your next best step. For existing home renovations and addition projects this usually involves a site visit to review the property and its existing conditions. If there is enough information about the property that is electronically available your General Contractor may be able to gather enough information (with your help) to expedite the estimating process.

    At this stage, any necessary discovery work (such as footing analysis and exterior wall assembly analysis) should be completed to ensure the existing structure can be utilized for your substantial renovation or home-building project.

    It is important at this stage to get multiple estimates for your project, so use your short-listed group of General Contractors or Home Builders from Step 1 to see what they can come up with for you. This will also act as an evaluation step to see which General Contractor is right for your project. Some things to consider when evaluating the estimated costing information from different companies:

    • Make note of which companies are taking the time to learn about the existing conditions of your home or property, they are likely going to have more accurate estimates

    • Be wary of the companies that only give you a “cost per square foot”. Per square foot of what? Does that include the garage? Does that include the basement? Inside or outside exterior wall? There is so much nuance with the way different companies do their pricing per square foot that it ends up being a horrible way to gauge project costs. If they are unwilling to take the time to give you an actual budget range then they don’t deserve your business.

    • Make note of the companies that are prompt with their responses and take the time to educate you about your project.

    This step shouldn’t take longer than a few weeks to complete, maybe less depending on the complexity of the project and how much information is available. BVM Contracting completes free preliminary construction estimates and can turn them around in less than 2 weeks. The goal is to see if the budget ranges provided can be supported by your finances/budget, and the ranges will vary depending on how much effort is put in by each General Contractor. At this phase it is best to avoid thinking the lowest budget range is going to work for the budget, chances are that all of the work has not been accounted for yet by the company that gave you a low estimate, so for the purposes of Step 5, look to the budget that has more detailed information/costing to determine your likelihood of being able to afford the project.

    Cost of Step 3 with BVM Contracting: $0

    Step 4: Get a Fee Proposal from a Permit Designer or Architect

    You’ll need a Permit Designer or Architect to draw up the plans for your home and walk you through the process of obtaining a building permit. Obtain a fee proposal from a couple of BCIN Permit Designers and/or Architects (both will work for residential construction projects). This fee proposal should cover the cost of:

    • Capturing the existing layout of your home (in the case of home additions and renovation projects where the existing home remains intact to some degree) through the use of laser scanners.

    • Reviewing your property’s zoning bylaws to determine what changes can be made to get you a building permit for your project to help guide the decision-making process for creating proposed floorplans

    • Creating the necessary layouts for your proposed project through CAD software (AutoCAD, Revit, Sketch-up, or similar)

    • Many times the Permit Designer or Architect will represent you at Committee of Adjustments (C of A) to get variances approved. They would also do research to determine which variances have been historically approved in your neighbourhood to help strengthen your application. In other cases (or for more complex cases) it makes sense to bring in a planning consultant to help ensure your application with C of A has the highest chance of success. It would be a good idea to ask the companies/people you are getting fee proposals from if they would represent you at C of A or not to help understand what the costs would be and if you should be thinking about bringing in a Planning Consultant.

    • Coordinating the structural, mechanical, and building code information onto the drawings to be reviewed in a final application for obtaining a building permit. Usually Permit Designers and Architects hire third-party Engineers and HVAC designers to complete the structural and mechanical components of the project but make sure those fees are included in their proposal.

    • Coordinating the permit application to submit to the local municipality

    At BVM, we have list of trusted and reputable Permit Designers and Architects who can help get you from concept to permit. We can refer you to some of the companies we work well with, but if you decide to go a separate route and hire your own that is perfectly fine. As long as your chosen Permit Designer or Architect allows us to work with them during the design phase then we are good to go!

    Cost of Step 4: Variable based on fee proposals and how detailed you want the drawings to be

    ***Note that BVM’s costs up until this point is still $0!***

    Step 5: Get Financing Approval

    With estimated costs in hand from your Builder Partner(s) and Design Partner(s), the next step is to secure financing from your Bank or Lender. Ensure that the projected costs fit within your budget and include a contingency for unexpected expenses. It would be a good idea to have at least a 5% contingency over and above the total costs shown from your Builder and Designer, though 10% would put you in a great position. The last thing you want to do is go into a construction project without a financial safety net so make sure that you aren’t moving forward unless you have more than the amounts given to you in steps 3 and 4. Confirming your financing early in this process ensures that you can proceed without financial interruptions during the project and aren’t wasting your time on a project you cannot afford.

    The most common sources of funding for projects are refinancing an existing mortgage, getting a second mortgage, a Home Equity Line of Credit (HELOC), or funding from private sources (family, friends, private investors).

    Give yourself a good month to go through this exercise, it takes a surprising amount of time to work with a financial institution so if you have to utilize one to get financing please keep this in mind. If you already know where the money is coming from and it is exceeds the amounts from steps 3 and 4 then please proceed to Step 6.

    Cost of Step 5: $0

    Step 6: Obtain a Topographic Survey

    A topographic survey provides detailed information about the contours and features of your property (trees, fencing, outbuildings, slopes, etc.) to overlay onto your permit drawings. This is crucial for the zoning review and for planning the construction as it will dictate the location, size, and height of your newly proposed home. While it’s ideal to obtain this early, you can wait until after securing financing to avoid spending money until you have financing approval. Your permit designer and GC can use educated assumptions in the meantime to determine what is possible on the property (Step 2).

    The amount of time it takes to obtain a survey is anywhere between 4-8 weeks depending on which surveyor you work with and how busy they are. BVM Contracting has a very good relationship with our Surveyor to help expedite the turnaround time of obtaining a survey, so feel free to reach out to us to get a quote from our surveyor!

    Cost of Step 5: $2 500-$3 500 + HST (from surveyor)

    You Guessed it! BVM’s Costs are Still $0!

    Step 7: the Design Process + Zoning Review

    Usually, your Design Partner will be able to start the design process concurrently with the process of getting an updated survey so concurrently with Step 6 you can reach out to your preferred Design Partner to engage them to help with the design and permitting for your project. Usually, their pricing is broken down based on which phase they are in so you won’t be paying everything upfront. Instead, you will pay a certain amount for a deposit to retain your chosen Design Partner, then they will start their process. As you hit certain milestones your Design Partner will invoice you based on the amounts outlined in their fee proposal. BVM Contracting can help you review the fee proposal to ensure you understand what the total costs will be and any potential charges that might come up during the process.

    Begin creating a preliminary set of drawings for your home. These preliminary designs will be used for the zoning review once you come up with a design you are comfortable moving forward with. The amount of time it takes to get to the point where you can submit the plans for zoning review varies, but expect it to take anywhere between 1.5 – 4 months depending on how busy your chosen design partner is and how many revisions are needed before you land on a finalized layout. The goal is to get the finalized layout submitted to the City as soon as possible for a zoning review to determine what your next step is (zoning certificate and straight to permit submission prep or Committee of Adjustment).

    During this process, you can lean on your preferred General Contractor or Home Builder to ask questions about how certain design decisions will affect the budget for your project. This is a key component of the design process to ensure that your design is not going to put you over budget. BVM offers this service free of charge to help build trust with every project and ensure you are going to be able to build once you get your permit.

    It is also important to note that Committee of Adjustment, if needed, will delay the process by many months if your design triggers variances. You can expect it to delay you by about 3-4 months, potentially more depending on which area of Toronto you are in and how many outstanding C of A applications are waiting for hearing dates (Scarborough v.s. North York, they have separate C of A hearings).

    Last point is the debate between submitting or not submitting for zoning review separate from the building code review (they are separated in Toronto). We strongly recommend doing the zoning review because it will give you absolute confidence that what you want to build is allowed to be built on your property. This will, in turn, justify further investment into the design/finalization of the drawings in Step 9 and give your GC/builder the confidence to price out the project in more detail for you. There is a cost associated to getting a zoning review (25% of the total permit submission costs), but this cost is applied to the total amount once you end up getting everything submitted for the building code review.

    Cost of Step 7: Variable depending on which designer you go with and how detailed you want the drawings

    BVM Costs: $0

    Step 8: Preliminary Pricing Based on Drawings

    Once your design has been reviewed for zoning by the City of Toronto and you get your zoning certificate (or when you get approval through C of A) we start building the detailed scope of work and preliminary budget for your project. This will allow you to make any necessary adjustments to the design to fall more in line with your budget BEFORE you submit the design for a permit.

    At BVM Contracting, we’re committed to providing our clients with realistic and accurate pricing tailored to their specific project. This step helps in aligning your design with your budget and provides a clear understanding of potential costs. This checkpoint is very important and should not be skipped (unless you want to have a permit in hand and a project that is already over budget). Even the best designers do not have a solid understanding of construction costs so it is your GC’s job to set expectations for where the budget will need to be based on your design. If adjustments need to be made they can be made to bring things back in line with your budget.

    This process varies depending on the size and complexity of the project but you can expect this to take 2-3 weeks. This step can usually be completed concurrently with Step 9 but your GC will advise you accordingly based on their review of your budget and the drawings.

    BVM Costs: Still $0

    Step 9: Finalize Design for Permit Submission

    Once you have a good understanding of the budget for your proposed design you will work with your design partner to finalize the drawings by overlaying the structural, mechanical, and building code information onto the drawings. This usually involves external involvement from a structural engineer and HVAC designer so this process usually takes between 4-8 weeks to complete. It is important to note that if you end up going through C of A that there will be a appeal period that lasts 30 days from when you get approval so you won’t be able to submit the finalized permit drawings until after 30 days from your hearing date. This usually works out because this process usually takes longer than 30 days to complete, especially when you are dealing with third-party consultants like Engineers and HVAC Designers.

    Once the finalized permit submission package is completed the knee-jerk reaction is to submit right away, but if you have time we usually recommend you wait until after the construction budget is finalized and the contract is reviewed and approved (steps 10 and 11). The reason for this is so you have all of the numbers finalized and contract reviewed so you can make sure the project is inline with your budget and you have a confirmed start date with your chosen GC before spending money on the remaining 75% of the permit fees.

    BVM Costs: You Guessed it, $0

    Step 10: Review Finalized Construction Budget

    Once there is a set of finalized drawings with the structural, mechanical, and building code information included BVM Contracting goes through the process of finalizing the scope of work/budget. This usually includes a site visit (for homes being maintained) with some of our subcontractors to understand the existing conditions of the home in more detail so we can finalize numbers and scope. We also send the drawings out to all of our vendors who will be supplying materials for the project to finalize material costs for the project.

    This process usually take a few weeks but is a very important step in this process. It will give you ultimate confidence that what you see on your budget/scope with us is what you get, and if other Builders or GC’s are not doing this you can take note and use that in your decision-making process. If other companies are unwilling to put in the time to help you finalize your budget before the contract is signed then do they really deserve your business? It is tedious and time-consuming but ultimately gives you the peace of mind you need to move forward with your project.

    BVM Costs: Rhymes with Hero Hollars

    Step 11: Contract Review and Signing

    Once the budget and scope are finalized, the last step is to review and sign the contract with your GC or home builder. This step formalizes your agreement and sets the terms for the construction process. We have put together a guide that outlines some of the key aspects of contracts in the residential construction industry that you can review further!

    BVM Costs: At this point once you are able to make the most informed decision we require a deposit upon contract signing to hold your project start date. Usually $25 000 + HST for larger projects.

    Step 12: Permit Submission

    Once you have a finalized budget and signed contract with a start date confirmed, it is time to submit your permit applications. Ideally, permit submission should be done after the contract is signed, but sometimes tighter timelines requires submission beforehand. In Toronto, expect a permit processing time of approximately 8-9 weeks after submission. There will likely be a bit of back and forth between the Examiner and your Permit Designer/Architect so your designer partner must be getting the Examiner the required information as fast as possible to prevent being sent back to the bottom of their application pile.

    Step 13: Time to Build!

    With permits in hand and contracts signed, it’s time to start building your dream home!

    By following this guide, you’ll be well-prepared to tackle the complexities of home building in Toronto and the GTA. Each step outlined above will help you to stay on track, on budget, and aligned with your goals, resulting in a successful and satisfying home construction project. 

    BVM Contracting is here to ensure you have a seamless home-building experience. If you are interested in speaking with a BVM Contracting representative about your new home build, garden suite/laneway suite build, home addition, multiunit conversion, or substantial home renovation project please reach out to us at contact@bvmcontracting.com.

    About BVM COntracting

    BVM Contracting is a full-service General Contractor or Home Builder located in Toronto. We provide home renovation and building services for major home renovations (kitchen renovations, bathroom renovations, basement renovations, full interior renovations, home additions, lot severances, and new home construction). Our goal is to help guide our clients through the process of renovating their home, from concept to completion.

    Further than providing General Contracting and Project Management for major home renovations, we also offer value-added services such as renovation financing, renovation rebate consultations and services, building permit and design services, smart home installation services, and real estate investor services.

    To learn more about our offering by visiting our services page.

  • Home Building Readiness Assessment

    Home Building Readiness Assessment

    Home Building Readiness Assessment

    Do you think you are ready to take on a new home-building project? Put your readiness to the test with our home building readiness assessment tool, which will allow you to determine which areas you need to work on before completing a home build.

    This assessment will take you less than 2 minutes to complete and there is no contact detail wall until after you receive your score. If you decide you would like to contact us to schedule a no-obligation, no-charge home building consultation to help improve your score we allow you to do so after you have received your score.

    Key Take-aways for assessing your readiness to build

    Home Building Costs: It is important to know how much your home building project is going to cost before wasting money on a design you cannot afford. BVM Contracting can help you get a realistic project budget in place using our database of historical home building projects. We even have a new home-building cost calculator for a quick estimate of how much your proposed home build is going to cost.

    Property-specific Zoning Information: If you are not allowed to build what you are hoping to build on your property there is no point in spending money on a design and permitting! It is important to know what is and isn’t possible on your property and BVM Contracting has the in-house team (and industry contacts) to advise you.

    Receiving Fee Proposal from Architect or Permit Designer: Before you go into the design process guns-a-blazing you should understand the total costs of your design and how much the permits will cost before committing to working with the designer. You should also know how much your proposed project may cost before going into the design phase, which any reputable home builder will be able to help with. BVM Contracting not only provides preliminary pricing BEFORE our clients enter into agreements with architects and permit designers, but we also work with your chosen design partner to ensure that the design fits with your budget.

    Home Building Project Financing: Often this is left till our clients have all of the above information (to avoid spinning tires and getting unnecessary credit checks), but very important. For bonus points (and to be in a better position for your discussions with home builders and design partners) you can look into your borrowing power BEFORE you start the process by using one of the many home financing/refinancing tools/calculators out there on the internet. It takes some work upfront but is worthwhile so you aren’t wasting too much time if you can’t yet afford the home build you want to complete.

    Updated Topographic Survey: Once you determine your preliminary home building costs, get your fee proposal from your design partner, get confirmation that you will be able to build what you want to build, and confirm that your financing is for the project you can then get an updated topographic survey of your property (which we can help you with by referring one of our surveyors).

    Conclusion

    It is important to understand how ready you are to build and our assessment tool will give you a great idea of where you stand. If you still need to fill in some gaps BVM Contracting is here to help you become 100 percent ready and feel confident about tackling your upcoming home building project.

    About BVM COntracting

    BVM Contracting is a full-service General Contractor or Home Builder located in Toronto. We provide home renovation and building services for major home renovations (kitchen renovations, bathroom renovations, basement renovations, full interior renovations, home additions, lot severances, and new home construction). Our goal is to help guide our clients through the process of renovating their home, from concept to completion.

    Further than providing General Contracting and Project Management for major home renovations, we also offer value-added services such as renovation financing, renovation rebate consultations and services, building permit and design services, smart home installation services, and real estate investor services.

    To learn more about our offering by visiting our services page.

  • Toronto Laneway Suites

    Toronto Laneway Suites

    Laneway Suites

    Toronto, Ontario

    What is a laneway suite? Where can you build a laneway suite in Toronto? Is my property eligible to build a laneway suite? What incentives are there to build a laneway suite? How do you build a laneway suite? And what is the approximate cost to build a laneway suite? BVM Contracting is here to answer all of these questions in this blog!

    As of August 2018, the City of Toronto has allowed the construction of laneway suites in Toronto. This is an exciting new plan to help increase the number of available housing stock in the City and try to make the City of Toronto more accessible and affordable. Learn how you can take advantage of your laneway’s untapped income potential and create a second unit/secondary suite on your property.

    What is A LANEWAY SUITE?

    A laneway suite is a self-contained living accommodation for a person or persons living together as a separate single housekeeping unit, in which both food preparation and sanitary facilities are provided for the exclusive use of the occupants of the suite, in a detached building that is ancillary to a residential building on the same lot, and is located in the rear yard abutting a public lane. Laneway housing is considered to be a second unit/secondary suite.

    WHERE CAN YOU BUILD A LANEWAY SUITE in Toronto?

    Further than the obvious answer of “in a laneway”?

    Initially, laneway suites were constrained to the Toronto and East York Districts, as they were the most dense in laneway properties. Although, as of Summer 2019 the construction of laneway suites is allowed across the entire City of Toronto. The only restricted area in the city is bounded by Avenue Road, the Canadian Pacific (CP) Limited rail corridor, Yonge Street, Rosedale Valley Road, Sherbourne Street, Bloor Street East and Bloor Street West.

    What are the Design Requirements for Laneway Suites?

    To keep it really simple the following image shows the major design requirements for being able to build a laneway suite on your property.

    The key aspects of the design to make note of are are the requirements for setbacks from property lines, separation from the principal residence, and soft landscaping for the property. There are also specific guidelines for building height based on the size and layout of your existing dwelling, and restrictions on the shape (or even existence) of the second storey if the Laneway Suite is too close to the Principal Residential Building.

    There are certain aspects of the by-law that offers flexibility in design of the laneway suites, namely:

    • The floor area of Laneway Suites do not count against the total floor area allowed on the lot.

    • Laneway Suites do not require a parking space for cars, although they do require a minimum of two bike parking spaces within the build-able footprint allowed by the setbacks (inside or outside the building). In addition to this, any lot containing a Laneway Suite does not require parking spaces at all. So, there’s no need to worry about getting into trouble if you give up a garage parking space to create a suite.

    BVM Contracting will be able to complete an on-site evaluation of your property to determine if it qualifies for the construction of laneway housing! Contact us to set-up a meeting!

    Incentive Programs for The Construction of Laneway Suites

    1) Development Charges (DC) Deferral Program for Ancillary Secondary Dwelling Units

    Since the development charges in the City of Toronto are not cheap, the City of Toronto was able to create a deferral program that allows homeowners building an ancillary secondary unit (AKA a laneway suite) to defer the development cost of the laneway suite, as long as the suite remains apart of the property and is not severed into a new property within 20 years of the issuance of the building permit.

    The DC Deferral Application can only be filled out (click here to open the form) after you apply for a building permit for the construction of a laneway suite. Additionally, if you intend to apply for this program, please do not pay your development charges as the City will not be able to credit back the fee.

    To learn more about who can apply and how to apply reach out to a BVM Contracting Renovation Consultant to start the conversation!

    2) Affordable Laneway Suites Program

    The Affordable Laneway Suites Pilot Program provides funding in form of a forgivable loan of up to $50,000 for eligible property owners developing a laneway suite. The loan will be forgiven in 15 years from the date when the first tenant occupies the laneway suite. A forgivable loan is essentially a loan that is voided if all of the terms of a particular agreement are satisfied. In this particular scenario, the rent being charged cannot exceed the City of Toronto Average Market Rent, by bedroom type at any time during the 15 year affordability period, as reported annually by Canada Mortgage and Housing Corporation (CMHC). Make sure that you understand the implications of charging average market rent, as it may lead to less rental income and also constrain you to only renting to long-term tenants.

    It is important to note that, just like the DC Deferral Program, you will need to have applied for a building permit before filling out the form (which can be found here). You will also need to be approved for the DC Deferral Program, so ensure that you fill out the DC Deferral Application form as soon as possible after you apply for your building permit!

    To learn more about if the affordable laneway suites program works for you reach out to a BVM Contracting Renovation Consultant to start the conversation!

    The Process of Building a Laneway Suite with BVM Contracting

    Once you have your building permits completed and approved for the project, the following process will be taken to build the laneway suite.

    • Demolition/Excavation: Before the process of building the laneway suite is started, the existing structure needs to be demolished. BVM Contracting will be able to efficiently demolish your existing structure and remove the debris using our in-house disposal services. The excavation will also be completed for the location of the laneway suite and a trench will be run in between the primary residence to the laneway suite to run the infrastructure out to the new secondary laneway suite.

    • Utility Infrastructure Run-outs: Once the slate is blank, this is the time to run all of the underground infrastructure to the location where the laneway suite is being constructed. More often than not the underground infrastructure (drains, plumbing, and natural gas) will need to be trenched from within your home out to the laneway suite. BVM Contracting will determine the location of all of the infrastructure on the property to determine the most cost effective way to run everything out to the laneway suite.

    Note about electrical: You have the choice to install a separate meter or use your primary residence’s existing infrastructure to run the electrical out to the laneway suite.

    • Foundation Creation: The building permits outline the type of foundation needed to support the load of the new laneway suite. BVM Contracting will ensure that the concrete work is completed quickly and efficiently to minimize the effect on laneway access to your fellow laneway-using neighbours. The foundation will be poured and underground infrastructure will be brought in once the foundation work is completed.

    • Rough Framing: Using our warehouse conveniently located in the City of Toronto, we are able to build the structure of the laneway offsite to minimize the disturbance in the laneway and the amount of framing material stocked on site. We then transport the components of the laneway structure to your property to be assembled within 2-3 days depending on the size and complexity of the structural detail for the home.

    • Roofing, Windows/Doors, and Exterior Finish: To enclose the structure and make it weather-resistant, the roofing is completed, windows/doors are installed, and exterior finish is installed. The exterior windows/doors and finish are then sealed to allow for a water-resistant finish.

    • Rough-in Work (electrical, plumbing, and HVAC): Usually as the exterior is being finished the interior of the laneway home or suite is being roughed-in for electrical/HVAC/plumbing. All plumbing supply lines and drains (for toilets, sinks, showers, bath tubs, hot water tank, etc.), electrical wiring (for potlights, ceiling lights, kitchen lighting, exterior lights, receptacles, baseboard heating etc.), and HVAC lines (for heat pumps, air conditioner, gas lines, etc.) are installed so that they can be insulated and dry-walled over.

    • Insulation & Drywall: Once the plumbing, HVAC, and electrical inspections are passed, it is now on to insulating the home. Ensure that the walls and attic are well insulated, and if you have a garage under the laneway suite ensure that the floor joists are insulated as well. If you are using both levels for livable space, it is recommended to insulate the concrete slab before installing flooring. You could even consider hydronic heating on the main level to help heat the entire suite.

    • Flooring Installation: Hardwood (solid or engineered), vinyl, tile, or laminate flooring will be installed based on the client’s specifications.

    • Finish Carpentry & Stairs: Once the insulation and drywall work is completed, it is time to complete the finish carpentry work (baseboard, shoemould, casing for windows and doors, hanging the interior doors, etc.) and installation of the stairs.

    • Finishes: This is the last step and usually includes the following items:

      • Painting

      • Vanity install

      • Toilet install

      • Faucet/Tap install

      • Kitchen cabinet and counter top install

      • Staining

      • Light fixture install

      • HVAC fixture install (supply and return vents)

    The Cost to Build a Laneway Suite in Toronto

    The cost to build a laneway suite will vary depending on the following variables:

    • Laneway access

    • The location of infrastructure on the property (electrical service, sewers, drains, plumbing, and natural gas).

    • The proposed square footage of the laneway suite.

    • Access to primary residence infrastructure (to provide connection to electrical, sewers, drains, plumbing, and natural gas).

    • Exterior finishes (vinyl siding v.s. stucco v.s. Maibec v.s….)

    • Interior finishes (IKEA v.s. custom cabinets, vinyl versus hardwood, etc.)

    It is safe to assume though that the cost to build and finish a laneway suite will be anywhere from $300 000-$600 000. Let BVM Contracting visit your property to determine if your property qualifies and what the approximate cost will be based on the above variables.

    It is important to note that laneway suites will also increase the value of your property, since secondary suites provide extra income to the property that can be used to subsidize a future buyer’s mortgage.

    Conclusion

    Laneway suites will be a very popular and potentially lucrative investment opportunity for any home owner that owns a property with an eligible laneway property. Let BVM Contracting, an experienced new home builder in Toronto, help you evaluate the return on investment and competitively budget your project so that you know the exact cost to build a laneway suite on your property.

    Contact us to speak with an experienced residential renovation company and get your laneway home build experience started! We will be able to walk you through the process of completing the project, from concept to completion.

    About BVM COntracting

    BVM Contracting is a full-service General Contractor or Home Builder located in Toronto. We provide home renovation and building services for major home renovations (kitchen renovations, bathroom renovations, basement renovations, full interior renovations, home additions, and new home construction). Our goal is to help guide our clients through the process of renovating their home, from concept to completion.

    Further than providing General Contracting and Project Management for major home renovations, we also offer value-added services such as renovation financing, renovation rebate consultations and services, building permit and design services, smart home installation services, and real estate investor services.

    To learn more about our offering by visiting our services page.